Lucent Technologies Lineage
®
2000 ECS Battery Plant H569-416
4 - 10 Installation
Issue 2 August 1996
Figure 4-3: Floor Mounting Template
If interference with floor reinforcing bars occurs
during installation of anchoring device at mounting
position "1" (primary mounting position), then
alternate locations "2", and "4" shall be selected
as follows:
3.94
2.00
18.00
2.00
3.94
2.00
2.00
25.88
1.17
7.25
9.59
3.25
Location "2" - If interfering bar at "1" runs perpendicular
to equipment lineup.
Location "3" - If interfering bar at "1" runs parallel
to equipment lineup.
Location "4" - Permitted only if two reinforcing bars,
running perpendicular and parallel respectively
,
cross at "1".