Lucent Technologies Galaxy Power System 4804AP H569-450
11 - 36 Installation
Issue 1 June 2000
Thermal Probe Connections, continued
Connecting a 210E
Module to a BLJ
Board
Thermal probes can be connected to a 210E module that will monitor the
temperature of the probes and provide the highest temperature to its
output.
•
One 210E module can be connected to Millennium or SCF systems
(through the BLJ board).
•
Up to three 210E modules can be connected to a Vector system
(through the BLJ board).
•
Each 210E module requires two connections to the BLJ board (see
Figure 11-23):
–
The Power Cable Assembly 847900180 supplies fused system
voltage to the 210E module. Connection is made to the ABS
and DG terminals of the BLJ board. Multiple ABS and DG
terminals are available as required.
–
The Alarm and Signal Cable Assembly connects to the BLJ
board using cable assembly 848302048 - 8 feet (2.4 meters).
Note: The order of connections is not important, but it should be noted
that alarms will be generated if a 210E module is connected to the
controller and powered up with no thermal probes connected.
Connecting a 210E Module to a BLJ Board
Step
Action
1
Connect the Power Cable Assembly (847900180) to the
ABS and DG terminals of the BLJ Terminal Board. See
Figure 11-23.
2
Connect the Alarm and Signal Cable Assembly
(847157674) to the BLJ board using cable assembly
848302048. See Figure
11-23.
Note: The length of the 848302048 cable assembly is 8 feet
(2.4 meters). The cable assembly can be cut to a shorter
length if mounting the 210E module on the bay door.
Continued on next page.