Lucent Technologies Galaxy Power System 4804AP H569-450
11 - 34 Installation
Issue 1 June 2000
Thermal Probe Connections
In This Section
This section provides procedures for installing thermal probes or 210E
Thermal Probe Multiplexer modules through the BLJ board in SCF,
Millennium, and Vector controller systems.
Safety
Galaxy Power Systems must be installed, serviced, and operated only by
skilled and qualified personnel who have the necessary knowledge and
practical experience with electrical equipment and who understand the
hazards that can arise when working on this type of equipment. Refer to
the controller manuals for additional connections.
Making
Connections
Thermal monitoring connections to the controller are made through the
BLJ board located on the cabinet door. Cables are then routed to the
lower cable guide as shown in Figure 11-21, then to thermal probe
locations or to externally located 210E modules.
Caution
Wear grounded antistatic wrist straps when installing thermal probes
or 210E modules. The wrist strap must contact the skin and is not to
be worn over clothing.
Figure 11-21: Thermal Probe and 210E Cabling Routing