![LTH Electronics MTD75 Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/lth-electronics/mtd75/mtd75_operation-manual_1945079036.webp)
Connections
- 34 -
MTD75 Operation Guide
Connections
Sensor Input
The MTD75 can be fitted with up to three optional sensor input cards providing Redox,
Electrodeless Conductivity and pH measurement inputs.
Redox Measurement Installation
The choice of the correct type of Redox electrode, how and where to mount it, so that it has
a representative sample of solution are probably the two most important considerations
when installing a Redox system.
The following criteria are of great importance during selection:
The chemical make-up, temperature and the viscosity of the sample.
The use of the correct materials for corrosion resistance.
Position of electrode for robustness and service access.
Ensuring a representative, uncontaminated solution sample.
To ensure correct electrode mounting the following conditions should be observed:
The electrode system can only measure what is in the immediate vicinity of the sensor area
of the probe.
A moderate flow is maintained to provide an “up to date” sample. Excessive flow rates,
however, can cause certain electrodes to rapidly deplete, which will result in inaccurate
readings. In this case a sealed reference is recommended.
Ensure that both the glass electrode and reference are in contact with the sample.
Avoid points where air can be trapped.
Avoid points of high turbulence as air bubbles will affect the measurement.
If the sample has solids present then use a guard or filter to protect the glass electrode.
The glass electrode contains a liquid, ensure that the probe is mounted so that the internal
filling solution is in contact with the glass bulb.
When a new redox electrode is first fitted or changed it may need to be calibrated (see
page 111). Depending on the application it may also need periodic re-calibration, the
MTD75 series provides an inbuilt count down timer which will trigger an alarm when
calibration interval has expired (see page 111).
Care and Maintenance of Redox Electrodes
All Redox electrodes contain an electrolyte solution, gel or polymer that has a limited life in
both operation and on the shelf. The electrode shelf life depends on its storage conditions,
it is recommended that the electrode should be used within six to twelve months after
purchase.
For gel filled, non-flow electrodes the storage boot may become dried out during storage.
This can result in evaporation of the water inside the electrode causing high impedance in
the reference cell. If allowed to fully dry out the operation of the electrode will be
irreversibly damaged. For electrodes in storage it is recommended that every three to four
months the following procedure is carried out:
Содержание MTD75
Страница 1: ...MTD75 Cooling Tower Controller Operation Guide ...
Страница 2: ......
Страница 5: ...Preface MTD75 Operation Guide 3 Declaration of Conformity ...
Страница 6: ...Preface 4 MTD75 Operation Guide ...
Страница 12: ...Introduction 10 MTD75 Operation Guide Introduction MXD75 Termination Overview ...
Страница 29: ...Installation MTD75 Operation Guide 27 Installation Horizontal Mounting Vertical Mounting ...
Страница 30: ...Installation 28 MTD75 Operation Guide Installation Blank ...
Страница 72: ...Biocide A 70 MTD75 Operation Guide Biocide A BLANK ...
Страница 74: ...Biocide B 72 MTD75 Operation Guide Biocide B BLANK ...
Страница 88: ...Inhibitor 86 MTD75 Operation Guide Inhibitor BLANK ...
Страница 98: ...pH Control 96 MTD75 Operation Guide pH Control BLANK ...
Страница 100: ...Alarm Relay 98 MTD75 Operation Guide Alarm Relay BLANK ...
Страница 108: ...Electrodeless Conductivity Setup 106 MTD75 Operation Guide ECS Setup BLANK ...
Страница 112: ...pH Input Setup 110 MTD75 Operation Guide pH Setup BLANK ...
Страница 118: ...Redox Calibration 116 MTD75 Operation Guide Redox Calibration BLANK ...
Страница 140: ...pH Calibration 138 MTD75 Operation Guide pH Calibration BLANK ...
Страница 142: ...Calibration Reset 140 MTD75 Operation Guide Calibration Reset BLANK ...
Страница 148: ...Current Outputs 146 MTD75 Operation Guide Current Outputs BLANK ...
Страница 152: ...Digital Inputs 150 MTD75 Operation Guide Digital Inputs BLANK ...
Страница 158: ...Configuration 156 MTD75 Operation Guide Configuration BLANK ...
Страница 160: ...Update Software 158 MTD75 Operation Guide Update Software BLANK ...
Страница 164: ...Save Restore Reset 162 MTD75 Operation Guide Save Restore Reset BLANK ...
Страница 166: ...Error Messages 164 MTD75 Operation Guide Error Messages BLANK ...
Страница 172: ...Modbus RS485 170 MTD75 Operation Guide Modbus RS485 BLANK ...
Страница 184: ...Data Logging 182 MTD75 Operation Guide Data Logging BLANK ...
Страница 246: ...Appendix F 244 MTD75 Operation Guide Appendix F Blank ...
Страница 254: ...Appendix G 252 MTD75 Operation Guide Appendix G BLANK ...
Страница 260: ...Notes 258 MTD75 Operation Guide ...
Страница 261: ...Notes MTD75 Operation Guide 259 ...
Страница 265: ......