Installation, operating and maintenance instructions
Active chilled beams HDF-600, ceiling installation
7.8
Maintenance intervals of the individual components
Component
Activity
To perform
months
as required
Unit, in general
Check for pollution, damage, corrosion,
correct positioning and fixation
12
Heat exchanger
Check for pollution, damage and corrosion
6
Clean to maintain function
6
x
Check water connections
12
Check proper function of entry and return
12
Vent
x
Check for hygienic condition
6
*
Shorten replacement intervals if outside or recirculating air are extremely dust loaded.
VDI 6022 sanitation requirements must be observed.
8.
Spare Parts
The following spare parts are available and may be or
dered from LTG Aktiengesellschaft stating unit type and
description.
Qty.
Ident-No.
Description
1
1047555
Heat exchanger
1
1051037
Clips
1
1042181
Steel rope
1
1051221
Diffuser grille
1
1051226
Frame
For heat exchangers please state connection (1/2”,
smooth copper tube)
1.Dient zur Identifizierung der letzten Seite
9.
Decommissioning, disposal
When the unit is taken out of service, is no longer used and
is disposed of as waste, the following must be complied
with:
- all steel parts are waste for recycling
- all plastic parts are waste for recycling
- all secondary substances and lubricants must be dis
posed of in accordance with the provisions of the EWC
(European Waste Catalogue) classification.