E
LTG Incorporated · PO Box 2889 · Spartanburg, S.C. 29304, USA
Chilled beams HDF-us-OM (01/17)
Phone 864 599-6340, Fax -6344 · [email protected] · www.LTG-INC.net
Former editions are invalid · Subject to technical modifications
page 2 of 30
Installation, operating and maintenance instructions
Active chilled beams HDF-600, ceiling installation
LTG Comfort Air Technology
Air Diffusers
Air Distribution
Air-Water-Systems
Contents
Page
1.
Safety
3
1.1 Explanation of symbols and hints
3
1.2 Operating safety directions
3
1.3 Intended use
4
2.
Transportation, storage
4
2.1 Transport instructions
4
2.2 Storage
4
3.
Function
4
3.1 Control system with CO
2
-Sensor
5
4.
Technical data
6
4.1 Dimensions
6
4.2 Performance data
8
4.3 Caloric output data
13
4.4 Acoustic data
15
4.5 Hydraulic data
15
4.6 Weight
15
5.
Installation
15
5.1 Notes
15
5.2 Suspension
15
5.3 Water connections
18
5.4 Check after installation
23
6.
First use
24
6.1 Adjustment of the nozzle band
24
7.
Operating, maintenance, repair
25
7.1 Open/close the unit
25
7.2 Heat exchanger, water connections
27
7.3 2-pipe and 4-pipe system
27
7.4 Selecting the room temperature
27
7.5 Out-of-service times
27
7.6 Repair
27
7.7 Troubleshooting and corrective action
27
7.8 Maintenance intervals of the individual
components
30
8.
Spare parts
30
9.
Decommissioning, disposal
30
Содержание HDF-600
Страница 31: ......