E
LTG Incorporated · PO Box 2889 · Spartanburg, S.C. 29304, USA
Chilled beams HDF-us-OM (01/17)
Phone 864 599-6340, Fax -6344 · [email protected] · www.LTG-INC.net
Former editions are invalid · Subject to technical modifications
page 25 of 30
Installation, operating and maintenance instructions
Active chilled beams HDF-600, ceiling installation
7.
Operating, maintenance, repair
All units are virtually maintenance free, however certain
things should be observed.
To work on the heat exchanger and the filter (option), first
open the device.
Any maintenance and repair work must be
performed by skilled and trained staff
only.
Before starting any maintenance or repair
work the unit is to be completely dis-
connected from the main power supply!
Parts and tools.
When working overhead.
7.1
How to open and close the unit
7.1.1 Type HDF-600/2A/…, 2-way diffusion
The outlet grille is attached to the housing with two push
buttons. On the side opposite the air connection are two
additional shroud lines.
Push
Button
Shroud line
Push
Button
Содержание HDF-600
Страница 31: ......