E
LTG Incorporated · PO Box 2889 · Spartanburg, S.C. 29304, USA
Chilled beams HDF-us-OM (01/17)
Phone 864 599-6340, Fax -6344 · [email protected] · www.LTG-INC.net
Former editions are invalid · Subject to technical modifications
page 24 of 30
Installation, operating and maintenance instructions
Active chilled beams HDF-600, ceiling installation
6.
First Use
Prior to first use any installation work and all checks must
have been completed.
Check for proper water and power supply.
6.1
Adjustment of the nozzle band (if built-in)
A
Isometric view
Detail A
Position 1:
all nozzles open
Detail A
Position 2:
50 % open nozzles
Detail A
Position 3:
all nozzles closed
Do not over-tighten the clamping bolts.
Содержание HDF-600
Страница 31: ......