23
Assembling instrunctions and maintenance
SECTION 6: INSTALLATION
A
B
C
A
B
2
C
1
1 - Open the ball valves (A e B), Fill the primary circuit and
venting the air through the air vent (C).
2 - Fill the secondary circuit (hygenic water) through the load/
unload caps. (1 e 2).
3 - Check the hydraulic tight.
4 - Powering the module.
5 - Check the correct working of the module.
Содержание 49060463
Страница 15: ...15 Installazione uso e manutenzione...
Страница 29: ...29 Assembling instrunctions and maintenance...
Страница 43: ...43 Instructions relatives l installation l utilisation et la maintenance...
Страница 57: ...57 Montage und Wartungsanleitung...