Finalizing the Installation
(for qualified installers only)
57
© Travis Industries
6/27/2019 - 1500
864 31K CF Aust
4
Install the LP pilot orifice following the instructions below.
(a) Use a 7/16” open-end wrench to remove the pilot hood.
(b) Remove and discard the Natural Gas (NG) orifice. Place the LP orifice in the pilot assembly then replace
the pilot hood, tightening the pilot hood until it is snug (do not over-tighten).
5 Re-install the manifold cover (see photo below). Replace the firebox components. Install the logs
and embers. Replace the glass
.
6 Remove the control panel to access the gas control valve. The stepper motor (adjustable regulator)
has an installation sheet included with it – make sure to follow all of the directions. Place the stepper
motor on the gas control valve (see Figure 1) –
MAKE SURE IT IS CORRECTLY ORIENTED
.
Secure using the screws included with the motor (see Figure 2) – tighten to 25 Lb-inches. Leak test
this area after installation to verify proper installation.
Figure 1
Figure 2
7
Make the gas line connection, bleed the gas line (if applicable), start the heater and thoroughly leak-test all gas
connections and the gas control valve.