17B
-
26
PETROL INJECTION
Throttle body potentiometer
K7J or K7M, and 710
17B
REMOVAL
Remove air filter unit mounting bolts (1).
Disconnect:
- the oil vapour rebreather pipe (2),
- the air inlet sleeve.
Remove the air filter unit.
Unclip ball joint (3).
Disconnect:
- potentiometer connector (4),
- the idling speed stepper motor connector (5).
Remove:
- the throttle valve by tilting it,
- potentiometer mounting bolts (4),
- the potentiometer.
108423
107361
1
1
2
107356
107357
3
5
4
Содержание X90
Страница 101: ...12A 7 FUEL MIXTURE Air inlet K7J and 710 12A 1202 1 3 2 1 Air filter unit 2 Throttle valve 3 intake manifold ...
Страница 102: ...12A 8 FUEL MIXTURE Air inlet K7M and 710 12A 1202 1 3 2 1 Air filter unit 2 Throttle valve 3 intake manifold ...
Страница 144: ...16A 12 STARTING LOAD Starter Identification K7J or K7M and 710 16A Engine Starter K7J MITSUBISHI M000T45171ZT K7M ...
Страница 212: ...19B 3 EXHAUST Pipe assembly K7J and 710 19B 109861 1 Cut zone 1 2 Cut zone 2 1 2 ...
Страница 213: ...19B 4 EXHAUST Pipe assembly K7M and 710 19B 109861 1 Cut zone 1 2 Cut zone 2 2 1 ...