17B
-
11
PETROL INJECTION
Position and speed sensor
K7J, and 710
17B
Program with the engine flywheel target after repla-
cing the speed and position sensor (1) or the engine
flywheel:
- make a deceleration with injection cut-off in se-
cond, third, fourth or fifth gear between 3,500 and
3,000 rpm, for at least 2 seconds,
- make a second deceleration with injection cut-off in
second, third, fourth or fifth gear between 2,400
and 2,000 rpm for at least 3 seconds.
Using the diagnostic tool, check that this program-
ming is properly done, ET060: « Flywheel signal
with engine running ».
Read the fault codes.
Repair if necessary.
Clear the fault codes.
Check that the vehicle is working correctly.
Essential equipment
diagnostic tool
109211
1
Содержание X90
Страница 101: ...12A 7 FUEL MIXTURE Air inlet K7J and 710 12A 1202 1 3 2 1 Air filter unit 2 Throttle valve 3 intake manifold ...
Страница 102: ...12A 8 FUEL MIXTURE Air inlet K7M and 710 12A 1202 1 3 2 1 Air filter unit 2 Throttle valve 3 intake manifold ...
Страница 144: ...16A 12 STARTING LOAD Starter Identification K7J or K7M and 710 16A Engine Starter K7J MITSUBISHI M000T45171ZT K7M ...
Страница 212: ...19B 3 EXHAUST Pipe assembly K7J and 710 19B 109861 1 Cut zone 1 2 Cut zone 2 1 2 ...
Страница 213: ...19B 4 EXHAUST Pipe assembly K7M and 710 19B 109861 1 Cut zone 1 2 Cut zone 2 2 1 ...