33
OPERATIONAL AIDS - EMERGENCY PROCEDURES
When operational aids are inoperative or malfunctioning, the following requirements shall apply for
continued use or shutdown of the crane�
1� Steps shall be taken to schedule repairs immediately� The operational aids shall be put back into
service as soon as replacement parts, if required, are available and the repairs and calibration can
be carried out� “Can be carried out” does not mean, when convenient� Every effort must be made
to expedite the repairs and recalibration�
2� When a load indicator, rated capacity indicator, or rated capacity limiter is inoperative or
malfunctioning, the designated person responsible for supervising the lifting operations shall
establish procedures for determining load weights� Loads with unknown weights shall not be
lifted without a properly functioning load indicating device�
3� When a boom angle or radius indicator is inoperative or malfunctioning, radii or boom angle shall
be determined by measurement�
4� When an ATB device, two-blocking damage prevention or two-block warning device is
inoperative or malfunctioning, the designated person responsible for supervising the lifting
operations shall establish procedures, such as assigning and additional signal person, to furnish
equivalent protection�
5� When a boom length indicator is inoperative or malfunctioning, the designated person responsible
for supervising the lifting operations shall establish the boom length at which the lift will be made
by actual measurement or marking on the boom�
6� When a level indicator is inoperative or malfunctioning, other means shall be used to level the crane
within the level requirements specified by the manufacturer�
In certain situations, it may be necessary to override the automatic motion limiter of the RCI / ATB unit
in order to safely operate the crane� These include but are not limited to:
The load block may lift the ATB weight before the load line can be tensioned while stowing the boom�
This will cause a motion cutout� Overriding the system, in this situation is acceptable in order to continue
to winch in slack line, securing the boom� Boom must be in the lowered position�
Содержание 35-127 M
Страница 1: ...OPERATORS MANUAL LOAD KING 35 127 M C1046093 REV A FEBRUARY 09 2022...
Страница 2: ...PAGE INTENTIONALLY LEFT BLANK...
Страница 48: ...PAGE INTENTIONALLY LEFT BLANK...
Страница 63: ...63 Description Of Machine and Controls Operator Controls 5 3 2 4 8 7 1 9 10 6...
Страница 79: ...79 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Страница 96: ...PAGE INTENTIONALLY LEFT BLANK...
Страница 109: ...109 Boom Angle Placards CAUTION Do not extend jib into this area unless boom is fully retracted...
Страница 124: ...PAGE INTENTIONALLY LEFT BLANK...
Страница 131: ...131 35 127 M Master Lube Chart 1 2 5 11 12 3 4 6 8 9 7...
Страница 132: ...132 35 127 M Maintenance...
Страница 150: ...150 35 127 M Maintenance...
Страница 172: ...PAGE INTENTIONALLY BLANK...
Страница 176: ...PAGE INTENTIONALLY LEFT BLANK...
Страница 201: ...201 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Страница 202: ...PAGE INTENTIONALLY LEFT BLANK...
Страница 209: ...209 Torque Specs SAE Metric...
Страница 210: ...210 35 127 M Appendix...
Страница 212: ...PAGE INTENTIONALLY LEFT BLANK...
Страница 213: ...Notes...
Страница 216: ...35 127 M Operator Manual...