Operating Instructions
Pump ZPU 08 ATEX
810-53711-1
Page 42 / 57
Rev.: 003
31/07/2017
Electrics
Electrical connections carried out correctly.
Cable entries sealed correctly.
The voltage and frequency of the power network correspond to the
information on the type identification plate of the motor.
Monitoring devices and additional equipment (e.g. motor circuit breaker)
are correctly connected and adjusted.
Grounding is complete.
All parts such as lines, cables, metering devices, etc. have been correctly
installed and are undamaged.
Mechanics:
No dust accumulations present, in particular on the air intake of the motor.
Loose or missing parts remaining (e.g. pressure relief valves, feed lines).
Damages, deformations, or cracks.
Smoke or smouldering spots.
Discolorations, contaminations and/or corrosion.
Unusual humidity.
Unusual odours, vibrations, or sounds.
Leakages of lubricant at connections and from lines.
8.4.
Activation of the pump
The pump is activated on:
Installation into a machine
o
By switching on the machine contact.
o
By a control provided by the customer.
Содержание ZPU 08
Страница 1: ...Operating Instructions Pump ZPU 08 ATEX 810 53711 1 Page 1 57 Rev 003 31 07 2017 ZPU 08 ...
Страница 52: ...Operating Instructions Pump ZPU 08 ATEX 810 53711 1 Page 52 57 Rev 003 31 07 2017 ...
Страница 53: ...Operating Instructions Pump ZPU 08 ATEX 810 53711 1 Page 53 57 Rev 003 31 07 2017 ...
Страница 54: ...Operating Instructions Pump ZPU 08 ATEX 810 53711 1 Page 54 57 Rev 003 31 07 2017 ...
Страница 55: ...Operating Instructions Pump ZPU 08 ATEX 810 53711 1 Page 55 57 Rev 003 31 07 2017 ...
Страница 56: ...Operating Instructions Pump ZPU 08 ATEX 810 53711 1 Page 56 57 Rev 003 31 07 2017 ...
Страница 57: ...Operating Instructions Pump ZPU 08 ATEX 810 53711 1 Page 57 57 Rev 003 31 07 2017 ...