Spirit II User’s Manual
Section 4: Operation with Manual Gas Console
This information is subject to the controls of the Export Administration Regulations [EAR]. This information shall not be provided to
non-U.S. persons or transferred by any means to any location outside the United States contrary to the requirements of the EAR.
4-3
Setting up to Mark
The system can mark with the same consumables that are used to cut. Refer to the
cutting charts in Section 5 for the correct settings. Connect nitrogen gas to the plasma
and shield inputs on the MGC (preflow and postflow inputs are not used for marking)
and then follow the steps below.
NOTE:
When the
Process
is set to
Marking
, the
Current
value is internally set to the
proper value even though the cutting current is displayed.
Push the
OFF Button
on the MGC to disable
the system. On the main menu, move the
pointer to
Setup
. Press the select
button.
Press the select
button until
Marking
is
displayed.
Move the pointer to
Adjust Gas
.
Press the select
button.
Move the pointer to
Plasma
and then press the
select
button to start the flow of gas. Turn
the corresponding regulator knob on the MGC
to adjust the displayed pressure to match the
value in the cutting chart. Repeat for the
Shield
gas. Move the pointer to
Return
and
press the select
button. Repeat to return to
the main menu.
The system is now ready to mark.