1. Install the required number of cable glands in the device housing. When us-
ing two cable glands, remove the plug with a 6 mm screwdriver and install the
second cable gland in its place.
2. Remove the process plug from the cable gland installed at the factory.
Fig. 5.6 Installing the second cable gland
Proceed as follows to connect the device:
1. Unscrew the level transmitter cover.
2. Loosen the collet nut of the cable gland.
3. Insert the cable into the device through the rubber seal of the cable gland.
The absence or damage to O-ring affects the device's dust protection and may
cause it to fail.
4. Remove the external insulation of the cable. In case of shielded cable, remove
the shield.
5. Remove 4-6 mm of the insulation from the wire edge. When using multi-
conductor wires, compress the stripped ends into tips.
6. Connect the cable as per the pin assignment diagram. As per cl. 5.4 and fol-
lowing the instructions on the device nameplate. Use a 3 mm screwdriver to
tighten the screw terminals.
Incorrect connection may cause the device to fail.
!
ATTENTION
!
ATTENTION
33
RE_ULM3DX_18_02_20
Содержание ULM-3D Series
Страница 4: ...all dimensions of ULM 3D 5 54 13 4 Handling of cable gland 56 4 RE_ULM3DX_18_02_20 ...
Страница 24: ...Fig 4 13 Installation examples 24 RE_ULM3DX_18_02_20 ...
Страница 29: ...13 Switch matching load of RS 485 line RA B 120 Ohm 29 RE_ULM3DX_18_02_20 ...
Страница 53: ...13 2 Level transmitter connection to the mount flange and overall dimensions of ULM 3D 5 53 RE_ULM3DX_18_02_20 ...
Страница 55: ...Installation of ULM 3D 1 level transmitter on a nozzle 55 RE_ULM3DX_18_02_20 ...