11
www.hillrom.com
7EN140108 Rev. 4 • 2020
After assembly and charging, ensure that:
• T
he motion of the lift arm corresponds to the buttons on the hand control/operation panel.
• T
he emergency lowering functions are working
(mechanical and electrical).
• T
he wheel brakes are working.
• T
he base-width adjustment works.
•
T
he battery is fully charged.
•
service interval is activated! Push following buttons on the handcontrol simultaneously:
Up / Down ,
until a audio signal (single beep) is heard = service interval activated.
(
Alternatively use the push buttons simultaneously for emergency lifting up and down on the control box)
11. Place the charger cable on the
hook provided on the mast after
completed charging.
10. A) Connect the extension cable for the charging cable to the control box.
B) Insert the extension cable in the tension clip underneath the control box.
C) Connect the charging cable to the extension cable.
IMPORTANT!
Always charge the battery before using the lift the first time.
Charge the battery until charging is completed, see "Charging the Battery" for
more information and instructions.
A
B
C
ON
CHARGE
BATTERY