Lighthouse S3100/S5100/Boulder Counter Operating Manual
8-2
248083389-1 Rev
Note:
The purge filter for
the Solair Boulder Counter
is attached to the ISP Filter
Cap. To run a purge count
test, place the filter cap
onto the ISO Probe that is
attached to the unit. See
Chapter 3: Unpacking,
Inspecting and Installing
for more information.
1.
Connect the Purge filter to the sample inlet.
2.
Connecting Purge filter
3.
Apply power to the instrument.
4.
Configure the unit to sample for 30 minutes.
5.
Allow the instrument to sample through a 30-minute period. This
time allows the unit to warm up and purge any residual particles
that might be inside it.
6.
Configure the unit to sample for 5 minutes with a 10-second hold.
7.
Set Cycles to 6 so the instrument will take 6 samples.
8.
If more than one count per five-minute period is reported, allow
the instrument to sample for 30 minutes to purge it, then repeat
the test.
9.
After the instrument has met the requirement of the Purge Count
test, return the instrument to its normal location and operating
status.
Troubleshooting
If the instrument does not pass the Purge Count test, please perform the
following procedure:
1.
Check the data over the last 6 five-minute sample times.
2.
If sporadic counts over all or several channels are occurring, the
unit may still have particles inside it. Allow the unit to sample
overnight with the purge filter attached before retesting it. If the
counts are still high after the overnight purge, call Lighthouse
Technical Support for assistance.
3.
If the data shows consistent counts in the smallest channel only,
the instrument may have electrical problems and may need to be
returned to Lighthouse. Call a Lighthouse Service Representative
at 800-945-5905 (USA Toll Free) or 541-770-5905 (Outside of
USA) for assistance.
Содержание solair 3100
Страница 1: ......
Страница 2: ...00...
Страница 3: ...Lighthouse Worldwide Solutions S3100 S5100 Boulder Counter Gen E Operating Manual...
Страница 6: ......
Страница 12: ...Lighthouse S3100 S5100 Boulder Counter Operating Manual t vi 248083389 1 Rev...
Страница 14: ...Lighthouse S3100 S5100 Boulder Counter Operating Manual ii 248083389 1 Rev...
Страница 19: ...Introduction 248083389 1 Rev 2 3 Figure 2 1 SOLAIR Dimensions Side Dimensions Top Dimensions...
Страница 22: ...Lighthouse S3100 S5100 Boulder Counter Operating Manual 2 6 248083389 1 Rev...
Страница 36: ...Lighthouse S3100 S5100 Boulder Counter Operating Manual 3 14 248083389 1 Rev...
Страница 60: ...Lighthouse S3100 S5100 Boulder Counter Operating Manual 4 24 248083389 1 Rev...
Страница 66: ...Lighthouse S3100 S5100 Boulder Counter Operating Manual 5 6 248083389 1 Rev...
Страница 115: ...Operating Counter 248083389 1 Rev 6 49 Figure 6 64 SOLAIR 3100 STATUS Screen...
Страница 180: ...Lighthouse S3100 S5100 Boulder Counter Operating Manual D 2 248083389 1 Rev...
Страница 187: ...00...
Страница 188: ......