Upright Reassembly
1.
Lubricate the full length of the outer upright rails with
chassis lube or Kendall SR-12X (see Figure 39).
2.
Attach an overhead hoist to the outer intermediate
upright and install it through the top of the outer
upright. Position it out the lower end of the outer upright
about 6 in. (15 cm).
3.
Assemble shims, load rollers and thrust blocks to the
upper end of the outer upright. Assemble shims and
load rollers to the lower end of the outer intermediate
upright.
Roller Shimming -
Install shims to provide a total side-
to-side clearance of 1/16 in. (1.5 mm) max. at the
tightest point throughout the travel of the upright (see
Figure 40). Pry between the upright and the load roller so
that the opposite load roller is tight against the upright.
Measure the clearance for the pair of rollers at the XXX
shown. Use an equal number of shims on each side.
NOTE:
Roll the uprights past installed thrust plugs/
blocks before checking load roller clearance.
Thrust Plug/Block Replacement -
Install thrust plugs/
blocks to provide a clearance of 1/16 in. (1.5 mm) max.
between an upright and its corresponding thrust plug/
block (see Figure 41). Pry between the upright upper
crossmembers. Measure the clearance at the XXX
shown to determine which thickness thrust plug/block to
use. Thrust plugs/blocks may be shimmed as required.
4.
Lubricate the full length of the outer intermediate
upright rails with chassis lube or Kendall SR-12X
(see Figure 40).
Figure 40. Channel lubrication area, load roller clearance
measurement.
Upright
Rails
MA0259.eps
.06 in.
(1.5 mm)
Max.
Load
Rollers
Upright
Rail
Lube
Shim
3
1 4
3
3
2
2
Outer
Intermediate
Upright
MA0246.eps
Inside
of Rail
Thrust
Block
Outer
Upright
.06 in.
(1.5 mm)
Max.
Thrust
Block
Thrust
Plugs
Figure 41. Installing outer intermediate upright.