Page
41
263920 R
2
S
ervice
5.5-5
Upright Reassembly
(continued)
13.
Attach an overhead hoist to the inner upright and install
through the top of the inner intermediate upright.
Position it out the lower end of the inner intermediate
upright about 6 in. (25 cm).
14.
Assemble shims and load roller to the lower end of the
inner upright. Assemble shims, load rollers and thrust
plugs to the upper end of the inner intermediate upright.
Refer to Step 3 for roller shimming and thrust plug
clearance measurement.
15.
Install the inner main lift chain anchors (long anchors)
on the back side, lower end of the inner upright and
connect the inner main lift chains.
16.
Install the stop/hose bracket/tube assembly on the
lower end of the inner upright. Tighten the capscrews
to 81-88 ft.-lbs. (110-120 Nm).
MA0251.eps
Inner
Upright
14
13
15
13
14
MA0252.eps
16
MA0269.eps
14
Thrust
Plug
Thrust
Plug
Shim
Figure 43. Installing inner upright.