Introduction 3
1.0
I
NTRODUCTION
1.1
Description
7KHý836WDWLRQ
Š
ý6êýXQLQWHUUXSWLEOHýSRZHUýVXSSO\ýõ836ôýV\VWHPýSURWHFWVý\RXUýYDOXDEOHýHTXLSð
PHQWñýGDWDñýDQGýSURFHVVHVýIURPýWKHýGLVWXUEDQFHVýSUHVHQWýLQýXWLOLW\ýSRZHUï
‡ %DWWHU\ýSURYLGHVýSRZHUýWRý\RXUýORDGVýGXULQJýXWLOLW\ýSRZHUýRXWDJHVï
‡ +LJKðSHUIRUPDQFHñýRQðOLQHñýPLFURSURFHVVRUðFRQWUROOHGýGHVLJQýHQVXUHVýFOHDQñýUHJXODWHGýSRZHUý
WRýWKHýORDGýUHJDUGOHVVýRIýXWLOLW\ýSRZHUýIOXFWXDWLRQVï
‡ +LJKO\ýLQWHOOLJHQWý836ýSXWVý\RXýLQýFRQWUROïý,QVWDOOýWKHý836WDWLRQý6êýDQGýIRUJHWýDERXWýLWýXQWLOý
WKHý836ýDOHUWVý\RXýWRýXQXVXDOýFLUFXPVWDQFHVïý2UñýFRQILJXUHýWKHý836ýWRýVHUYHýDVýDýVRXUFHýRIý
LQIRUPDWLRQýDQGýDýSRZHUýFRQWUROýEDVHýIRUý\RXUýVSHFLILFýDSSOLFDWLRQïý3URJUDPPDEOHýSDUDPHWHUVñý
FRPSXWHUýLQWHUIDFHVñýDQGýVHYHUDOýQHWZRUNýFRQWUROýIHDWXUHVýõUHPRWHýVWDWXVîFRQWUROñýHYHQWýORJð
JLQJñýDQGýRWKHUVôýSURYLGHýPD[LPXPýDSSOLFDWLRQýIOH[LELOLW\ï
‡ 2WKHUýIHDWXUHVýLQFOXGHã
Dï 2QðOLQHñýVLQHZDYHý836ýXVLQJýPLFURSURFHVVRUðFRQWUROOHGýDGYDQFHGýVZLWFKLQJýWHFKQRORJ\
Eï 7KUHHýSKDVHý3XOVHý:LGWKý0RGXODWHGýõ3:0ôýLQYHUWHUñýZLWKýRSWLRQDOýLVRODWHGýQHXWUDO
Fï )URQWý6HUYLFHý$FFHVVýZLWKRXWýPRYLQJýHTXLSPHQW
Gï )OH[LEOHýEDWWHU\ýFRQILJXUDWLRQV
Hï 7ZRýOHYHOñýWHPSHUDWXUHðFRPSHQVDWHGýEDWWHU\ýUHFKDUJHýIRUýORQJHUýEDWWHU\ýOLIH
Iï 3URJUDPPDEOHýYROWDJHýDQGýIUHTXHQF\
Jï 2SWLRQDOý2XWSXWý'LVWULEXWLRQý3DQHOERDUG
Kï 0LQLPDOýIRRWSULQW
Lï 8/ýìææåýOLVWHGýDQGý&6$ýFHUWLILHGýIRUýXVHUýVDIHW\ï
1.2
Site Planning Data
5HIHUýWRý
7DEOH ìýðý6LWHý3ODQQLQJý'DWD
ýIRUýXQLWýUDWLQJVñýYROWDJHVñýDQGýGLPHQVLRQVï
7KHý836WDWLRQý6êýLVýLQWHQGHGýIRUýLQVWDOODWLRQýLQýDýWHPSHUDWXUHýFRQWUROOHGñýLQGRRUýDUHDýIUHHýRIýFRQð
GXFWLYHýFRQWDPLQDQWVï
1.3
UPS Cabinet
1.3.1
Casters and Feet
7KHýXQLWýLVýPRXQWHGýRQýVZLYHOLQJýFDVWHUVýZLWKýOHYHOLQJýIHHWï
1.3.2
Cooling
7KHýXQLWýLVýIRUFHGðDLUýFRROHGýE\ýLQWHUQDOO\ðPRXQWHGýIDQVïý7KHýILOWHUHGýDLUýLQWDNHýLVýIURPýWKHýERWWRPý
RIýWKHýXQLWýDQGýDLUýH[KDXVWýLVýDWýWKHýWRSïý
1.3.3
Access
)URQWýDFFHVVýRQO\ýLVýUHTXLUHGýIRUýRSHUDWLRQýDQGýPDLQWHQDQFHýRIýWKHý836ïý(TXLSPHQWýPD\ýEHý
SODFHGýRQýERWKýVLGHVýRIýWKHýXQLWýDQGýWKHýXQLWýPD\ýEHýSODFHGýDJDLQVWýDýZDOOýõëýLQïýFOHDUDQFHýRQO\ôï
Содержание UPStation S3
Страница 1: ...POWER PROTECTION UPStation S3 Three Phase 12 kVA to 24 kVA 50 and 60 Hz User Manual ...
Страница 2: ......
Страница 6: ...iv ...
Страница 23: ...Installation 17 Figure 1 One Line Drawing Single Input Configuration 200 240V In Out ...
Страница 24: ...18 Installation Figure 2 One Line Drawing Dual Input Configuration 200 240V In Out ...
Страница 25: ...Installation 19 Figure 3 One Line Drawing Single Input Configuration With Neutral Isolation 200 240V In Out ...
Страница 26: ...20 Installation Figure 4 One Line Drawing Dual Input Configuration With Neutral Isolation 200 240V In Out ...
Страница 27: ...Installation 21 Figure 5 One Line Drawing Single Input Configuration 400 480 600V In 208V Out ...
Страница 28: ...22 Installation Figure 6 One Line Drawing Dual Input Configuration 400 480 600V In 208V Out ...
Страница 31: ...Installation 25 Figure 9 One Line Drawing Single Input Configuration 400 480 600V In Out ...
Страница 32: ...26 Installation Figure 10 One Line Drawing Dual Input Configuration 400 480 600V In Out ...
Страница 34: ...28 Installation Figure 12 One Line Drawing Dual Input Configuration With Neutral Isolation 400 480 600V In Out ...
Страница 35: ...Installation 29 Figure 13 Cabinet Dimensions ...
Страница 36: ...30 Installation Figure 14 Cabinet Dimensions With Transformer Cabinet ...
Страница 37: ...Installation 31 Figure 15 Connecting Terminal Details ...
Страница 38: ...32 Installation Figure 16 Connecting Terminal Details With Transformer Cabinet ...
Страница 39: ...Installation 33 Figure 17 Battery Option Details 12 Inch Cabinet ...
Страница 40: ...34 Installation Figure 18 Battery Option Details 24 Inch Cabinet ...
Страница 41: ...Installation 35 Figure 19 Field Lug Wiring Terminations ...
Страница 42: ...36 Installation Figure 20 Unloading Instructions ...
Страница 43: ...Installation 37 Figure 21 Unloading Instructions 24 Inch Battery Cabinet ...
Страница 44: ...38 Installation Figure 22 Battery Times ...
Страница 53: ...Operation 47 Figure 25 Configuration Menu Tree ...
Страница 55: ...Operation 49 Figure 26 Control Switch Locations ...
Страница 68: ...62 Features Options Figure 27 RS 232 Connections ...
Страница 69: ...Features Options 63 Figure 28 Output Distribution Panel Board ...