66 Specifications
6.0
S
PECIFICATIONS
6.1
System
6.2
Physical Characteristics
5HIHUýWRý
7DEOH ìýðý6LWHý3ODQQLQJý'DWD
ýIRUýGLPHQVLRQVýDQGýZHLJKWVï
6.3
AC Input
6.4
AC Output
6.5
Battery
Safety Agencies:
UL 1778 listed
CSA 22.2, No. 107.1 certified
Audible Noise:
57 dBA at one meter
Transient/Surge Protection:
Per IEEE 587/ANSI C62.41 Categories A & B
Operating Environment:
0° to 40°C
25° ±5°C for batteries
Relative Humidity:
0 to 95% relative humidity (non-condensing)
Altitude:
6600 feet (2,000 meters)
Voltage Range:
170 to 264 VAC (See Table 1 - Site Planning Data)
Voltage Configuration
and Connection:
Three phase input, Wye configuration with 3 phases, ground and neutral.
Dual input if input and output voltages are not the same.
Frequency Range:
45 Hz to 65 Hz
Input Current THD:
25% - 30% THD maximum at full load
3% THD option available
Power Factor:
.95 Standard
.99 with 3% THD Option
Voltage Regulation:
±1% for balanced loads
±1.5% for 100% unbalanced loads
Voltage Distortion:
Maximum 2% THD for linear loads at 208 VAC
Maximum 3.5% THD for full non-linear loads at 208 VAC
Transient Response:
±1% for 100% step load;
recovery to within 1% in one cycle
Frequency:
50 Hz or 60 Hz
Frequency Slew Rate:
1 Hz/sec (user-selectable 0.1 to 3 Hz/sec)
Frequency Sync Range:
±1 Hz (user-selectable ±0.1 Hz to 5 Hz)
Load Crest Factor:
3:1
Overload:
125% for 10 minutes, 150% for 10 seconds
Unbalanced Load Capability:
Up to 100% of the individual phase rating
Type:
Standard: Valve-regulated, lead acid
Optional: Flame retardant, valve-regulated, lead-acid (rated for computer
room operation)
Recharge Rate:
10 times discharge duration to 95% when “turbo” mode is selected
Battery Run-Time:
Varies with battery cabinet selection
Battery Voltage:
Nominal: 240 VDC
Содержание UPStation S3
Страница 1: ...POWER PROTECTION UPStation S3 Three Phase 12 kVA to 24 kVA 50 and 60 Hz User Manual ...
Страница 2: ......
Страница 6: ...iv ...
Страница 23: ...Installation 17 Figure 1 One Line Drawing Single Input Configuration 200 240V In Out ...
Страница 24: ...18 Installation Figure 2 One Line Drawing Dual Input Configuration 200 240V In Out ...
Страница 25: ...Installation 19 Figure 3 One Line Drawing Single Input Configuration With Neutral Isolation 200 240V In Out ...
Страница 26: ...20 Installation Figure 4 One Line Drawing Dual Input Configuration With Neutral Isolation 200 240V In Out ...
Страница 27: ...Installation 21 Figure 5 One Line Drawing Single Input Configuration 400 480 600V In 208V Out ...
Страница 28: ...22 Installation Figure 6 One Line Drawing Dual Input Configuration 400 480 600V In 208V Out ...
Страница 31: ...Installation 25 Figure 9 One Line Drawing Single Input Configuration 400 480 600V In Out ...
Страница 32: ...26 Installation Figure 10 One Line Drawing Dual Input Configuration 400 480 600V In Out ...
Страница 34: ...28 Installation Figure 12 One Line Drawing Dual Input Configuration With Neutral Isolation 400 480 600V In Out ...
Страница 35: ...Installation 29 Figure 13 Cabinet Dimensions ...
Страница 36: ...30 Installation Figure 14 Cabinet Dimensions With Transformer Cabinet ...
Страница 37: ...Installation 31 Figure 15 Connecting Terminal Details ...
Страница 38: ...32 Installation Figure 16 Connecting Terminal Details With Transformer Cabinet ...
Страница 39: ...Installation 33 Figure 17 Battery Option Details 12 Inch Cabinet ...
Страница 40: ...34 Installation Figure 18 Battery Option Details 24 Inch Cabinet ...
Страница 41: ...Installation 35 Figure 19 Field Lug Wiring Terminations ...
Страница 42: ...36 Installation Figure 20 Unloading Instructions ...
Страница 43: ...Installation 37 Figure 21 Unloading Instructions 24 Inch Battery Cabinet ...
Страница 44: ...38 Installation Figure 22 Battery Times ...
Страница 53: ...Operation 47 Figure 25 Configuration Menu Tree ...
Страница 55: ...Operation 49 Figure 26 Control Switch Locations ...
Страница 68: ...62 Features Options Figure 27 RS 232 Connections ...
Страница 69: ...Features Options 63 Figure 28 Output Distribution Panel Board ...