8 Installation
2.2.1
Installation Considerations
ìï 8WLOL]HýWKHýVKRUWHVWýRXWSXWýGLVWULEXWLRQýFDEOHýUXQVýSRVVLEOHýDWýWKHýLQVWDOODWLRQýVLWHñýFRQVLVWHQWý
ZLWKýORJLFDOýHTXLSPHQWýDUUDQJHPHQWýDQGýLQýFRPSOLDQFHýZLWKý1(&ýDQGýORFDOýHOHFWULFDOýFRGHVïý
$OORZýVSDFHýIRUýIXWXUHýHTXLSPHQWýDGGLWLRQVï
ëï 5HFRPPHQGHGýDPELHQWýWHPSHUDWXUHýIRUýRSHUDWLRQýLVýëíýWRýêíýGHJUHHVý&HOVLXVýõçåýWRýåçý
GHJUHHVý)DKUHQKHLWôïý5HODWLYHýKXPLGLW\ýPXVWýEHýOHVVýWKDQýäèøýQRQðFRQGHQVLQJïý,QýDOWLWXGHVý
DERYHýëíííýPHWHUVýõçñèçíýIHHWôñýWKHý836ýUDWLQJýZLOOýEHýUHGXFHGï
êï 7KHýURXWHýDQGýIRXQGDWLRQýWRýWKHýLQVWDOODWLRQýVLWHýPXVWýEHýFDSDEOHýRIýVXSSRUWLQJýWKHýZHLJKWýRIý
FDELQHWVýDQGýPRYLQJýHTXLSPHQWïý5HIHUýWRý
7DEOH ì
ýIRUýVSHFLILFýLQIRUPDWLRQýDERXWýFDELQHWý
ZHLJKWVï
éï 3ODQýWKHýURXWHýWRýHQVXUHýXQLWýZLOOýSDVVýWKURXJKýDOOýHOHYDWRUVñýFRUQHUVñýDQGýGRRUZD\VýWRýSUHYHQWý
GDPDJHï
èï +HDWýRXWSXWýRIý836ýHTXLSPHQWýLVýVLJQLILFDQWïý%HýVXUHýHQYLURQPHQWDOýFRQGLWLRQLQJýV\VWHPVý
FDQýDFFRPPRGDWHýWKLVýKHDWýORDGñýHYHQýGXULQJýXWLOLW\ýRXWDJHVïý5HIHUýWRý
7DEOH ìý
IRUýPRUHý
VSHFLILFýLQIRUPDWLRQï
2.2.2
Unloading and External Inspection
,QýPRVWýFDVHVýWKHý836ýDQGýLWVýEDWWHU\ýPRGXOHýDUHýVKLSSHGýEROWHGýWRJHWKHUýRQýWKHýVDPHýSDOOHWïý
6RPHýODUJHUýFRQILJXUDWLRQVýXVHýVKLSSLQJýVSOLWVýDQGýPD\ýFRPHýRQýëýRUýPRUHýSDOOHWVïý5HIHUýWRý
)LJXUH ëí
ýDQGý
)LJXUH ëìï
ý0RYHýWKHýFDELQHWVýDVýFORVHýDVýSRVVLEOHýWRýWKHýLQWHQGHGýORFDWLRQýEHIRUHý
UHPRYLQJýIURPýWKHýSDOOHWïý,IýWKHýXQLWýDUULYHVýDVýDýVKLSSLQJýVSOLWñý\RXUý/LHEHUWý*OREDOý6HUYLFHVýSHUð
VRQQHOýZLOOýUHFRQQHFWýWKHýFDELQHWVýDQGýFDELQHWýZLULQJýDVýSDUWýRIýWKHLUýVWDUWýXSýVHUYLFHï
ìï ,QVSHFWýHTXLSPHQWýDQGýVKLSSLQJýFRQWDLQHUõVôýIRUýDQ\ýVLJQVýRIýGDPDJHýRUýPLVKDQGOLQJïý'RýQRWý
DWWHPSWýWRýLQVWDOOýWKHýV\VWHPýLIýGDPDJHýLVýDSSDUHQWïý,IýDQ\ýGDPDJHýLVýQRWHGñýILOHýDýGDPDJHý
FODLPýZLWKýWKHýVKLSSLQJýDJHQF\ýZLWKLQýëéýKRXUVñýDQGýFRQWDFWý/LHEHUWý*OREDOý6HUYLFHVýDWý
ìðåííðèéêðëêæå
ýWRýLQIRUPýWKHPýRIýWKHýGDPDJHýFODLPýDQGýWKHýFRQGLWLRQýRIýWKHýHTXLSPHQWï
ëï &RPSDUHýFRQWHQWVýRIýVKLSPHQWýZLWKýWKHýELOOýRIýODGLQJïý5HSRUWýDQ\ýPLVVLQJýLWHPVýWRýWKHýFDUULHUý
DQGýWRý/LHEHUWý*OREDOý6HUYLFHVýLPPHGLDWHO\ï
êï &KHFNýQDPHSODWHýRQýWKHýLQVLGHýRIýFDELQHWýIURQWýGRRUýWRýYHULI\ýPRGHOýQXPEHUñýN9$ýUDWLQJñýDQGý
LQSXWîRXWSXWýYROWDJHýFRUUHVSRQGVýZLWKýWKHýRQHýVSHFLILHGïý5HFRUGýPRGHOýDQGýVHULDOýQXPEHUýLQý
WKHýIURQWýRIýWKLVýPDQXDOïý$ýUHFRUGýRIýWKLVýLQIRUPDWLRQýLVýQHFHVVDU\ýVKRXOGýVHUYLFLQJýEHFRPHý
UHTXLUHGï
2.2.3
Internal Inspection of the UPS System
ìï 9HULI\ýWKDWýDOOýLWHPVýKDYHýEHHQýUHFHLYHGï
ëï ,IýVSDUHýSDUWVýZHUHýRUGHUHGñýYHULI\ýDUULYDOï
êï &KHFNýIRUýVKLSSLQJýGDPDJHýLQWHUQDOO\ï
éï &KHFNýIRUýDQ\ýORRVHýFRQQHFWLRQVýRUýXQVHFXUHGýFRPSRQHQWVýLQýWKHý836ý0RGXOHï
èï &KHFNýIRUýLQVWDOODWLRQýRIýVDIHW\ýVKLHOGVýRQýWKHý836ýPRGXOHïý7KHUHýVKRXOGýQRWýEHýDQ\ýH[SRVHGý
WHUPLQDOVýZKHQýWKHýFDELQHWýGRRUVýDUHýRSHQHGï
çï &KHFNýIRUýDQ\ýXQVDIHýIHDWXUHýWKDWýPD\ýEHýDýSRWHQWLDOýVDIHW\ýKD]DUGï
$
:$51,1*
'2ý127ý5(029(ý7+(ý6833257,1*ý%$1'6ý817,/ý<28ý
,17(1'ý72ý5(029(ý81,7ý)520ý7+(ý3$//(7ïý6+,33,1*ý
%$1'6ý$5(ý86('ý72ý6(&85(ý7+(ý81,7ý72ý7+(ý3$//(7ïý
(;75(0(ý&$5(ý,6ý1(&(66$5<ý'85,1*ý029,1*ïý7(67ý/,)7ý
$1'ý%$/$1&(ý7+(ý&$%,1(76ý%()25(ý75$163257,1*ïý
0$,17$,1ý0,1,080ý7,/7ý)520ý9(57,&$/ý$7ý$//ý7,0(6ïý
'2ý127ý7,/7ý%(<21'ýìèý'(*5((6ý)520ý7+(ý9(57,&$/ý$7ý
$1<ý7,0(ï
Содержание UPStation S3
Страница 1: ...POWER PROTECTION UPStation S3 Three Phase 12 kVA to 24 kVA 50 and 60 Hz User Manual ...
Страница 2: ......
Страница 6: ...iv ...
Страница 23: ...Installation 17 Figure 1 One Line Drawing Single Input Configuration 200 240V In Out ...
Страница 24: ...18 Installation Figure 2 One Line Drawing Dual Input Configuration 200 240V In Out ...
Страница 25: ...Installation 19 Figure 3 One Line Drawing Single Input Configuration With Neutral Isolation 200 240V In Out ...
Страница 26: ...20 Installation Figure 4 One Line Drawing Dual Input Configuration With Neutral Isolation 200 240V In Out ...
Страница 27: ...Installation 21 Figure 5 One Line Drawing Single Input Configuration 400 480 600V In 208V Out ...
Страница 28: ...22 Installation Figure 6 One Line Drawing Dual Input Configuration 400 480 600V In 208V Out ...
Страница 31: ...Installation 25 Figure 9 One Line Drawing Single Input Configuration 400 480 600V In Out ...
Страница 32: ...26 Installation Figure 10 One Line Drawing Dual Input Configuration 400 480 600V In Out ...
Страница 34: ...28 Installation Figure 12 One Line Drawing Dual Input Configuration With Neutral Isolation 400 480 600V In Out ...
Страница 35: ...Installation 29 Figure 13 Cabinet Dimensions ...
Страница 36: ...30 Installation Figure 14 Cabinet Dimensions With Transformer Cabinet ...
Страница 37: ...Installation 31 Figure 15 Connecting Terminal Details ...
Страница 38: ...32 Installation Figure 16 Connecting Terminal Details With Transformer Cabinet ...
Страница 39: ...Installation 33 Figure 17 Battery Option Details 12 Inch Cabinet ...
Страница 40: ...34 Installation Figure 18 Battery Option Details 24 Inch Cabinet ...
Страница 41: ...Installation 35 Figure 19 Field Lug Wiring Terminations ...
Страница 42: ...36 Installation Figure 20 Unloading Instructions ...
Страница 43: ...Installation 37 Figure 21 Unloading Instructions 24 Inch Battery Cabinet ...
Страница 44: ...38 Installation Figure 22 Battery Times ...
Страница 53: ...Operation 47 Figure 25 Configuration Menu Tree ...
Страница 55: ...Operation 49 Figure 26 Control Switch Locations ...
Страница 68: ...62 Features Options Figure 27 RS 232 Connections ...
Страница 69: ...Features Options 63 Figure 28 Output Distribution Panel Board ...