Installation 7
2.2
UPS Installation
3URSHUýSODQQLQJýZLOOýVSHHGý836ýXQORDGLQJñýORFDWLRQýDQGýFRQQHFWLRQïý0DNHýVXUHýWKHUHýLVýDGHTXDWHý
FOHDUDQFHýIRUýWKHý836ýPRGXOHýGRRUýWRýRSHQýIXOOýVZLQJïý&KHFNýIRUýDýPLQLPXPýRIýìëýLQïýFOHDUDQFHý
DERYHýERWKýWKHýEDWWHU\ýDQGý836ýPRGXOHVýIRUýH[KDXVWýDLUýWRýIORZýZLWKRXWýUHVWULFWLRQïý$OVRýDOORZý
DGHTXDWHýFOHDUDQFHýDWýERWWRPýIURQWýRIýHDFKýFDELQHWýIRUýXQUHVWULFWHGýLQWDNHýDLUýWRýIORZïý0DNHýVXUHý
URRPýKDVýDGHTXDWHýYHQWLODWLRQýDQGýFRROLQJïý,QVWDOOýWKHý836ýLQýDýFOHDQýDQGýGU\ýORFDWLRQï
,QVWDOOýWKHý836ýDFFRUGLQJýWRýGUDZLQJVý
õ)LJXUH ìê
ýWRý
)LJXUH ëì
ýDQGý
7DEOH ëý
WKURXJK
ý7DEOH éô
ý
DQGýWKHýIROORZLQJýSURFHGXUHVïý$IWHUýLQVWDOODWLRQýLVýFRPSOHWHñýFRQWDFWý/LHEHUWý*OREDOý6HUYLFHVýDWý
ìðåííðèéêðëêæå
ýWRýVFKHGXOHýFKHFNRXWýDQGýVWDUWðXSýDVVLVWDQFHï
$ý/LHEHUWýDXWKRUL]HGýUHSUHVHQWDWLYHýPXVWýSHUIRUPýDQýLQLWLDOýV\VWHPýVWDUWðXSýWRýHQVXUHýSURSHUý
836ýRSHUDWLRQïý(TXLSPHQWýZDUUDQWLHVýZLOOýEHýYRLGHGýXQOHVVýV\VWHPýVWDUWðXSýLVýSHUIRUPHGýE\ýDý
/LHEHUWýDXWKRUL]HGýUHSUHVHQWDWLYHï
$
$77(17,21ý,167$//(56
3URSHUýZLUHýVL]LQJýõVHUYLFHýUDWLQJVôýDQGýSKDVHýURWDWLRQýDUHý
FULWLFDOýWRýWKHýVXFFHVVIXOýLQVWDOODWLRQýRIýWKLVýSURGXFWïý5HIHUýWRý
7DEOH ìýðý6LWHý3ODQQLQJý'DWDï
0DNHýVXUHý\RXýKDYHýLQVWDOOHGýSURSHUO\ýVL]HGýH[WHUQDOýRYHUFXUUHQWý
SURWHFWLRQïý5HIHUýWRý7DEOH ìï
$
:$51,1*
5($'ý7+,6ý0$18$/ý7+2528*+/<ý%()25(ý$77(037,1*ý72ý
:,5(ý25ý23(5$7(ý7+(ý81,7ïý,03523(5ý,167$//$7,21ý,6ý
7+(ý0267ý6,*1,),&$17ý&$86(ý2)ý836ý67$57ð83ý
352%/(06ïý72ý5('8&(ý7+(ý5,6.ý2)ý),5(ñý&211(&7ý21/<ý
72ý$ý&,5&8,7ý3529,'('ý:,7+ý%5$1&+ý&,5&8,7ý29(5ð
&855(17ý3527(&7,21ý6,=('ý,1ý$&&25'$1&(ý:,7+ý1(&ñý
$16,î1)3$ýæíïý)25ý0$;,080ý%5$1&+ý&,5&8,7ý
29(5&855(17ý3527(&7,21ý6,=,1*ñý5()(5ý72ý7+(ý'$7$ý
,1ý7$%/( ìýðý6,7(ý3/$11,1*ý'$7$ýõ$&ý,1387ñý5(48,5('ý
(;7(51$/ý29(5&855(17ý3527(&7,21ôï
'2ý127ý,167$//ý7+(ý(48,30(17ý1($5ý$1<ý*$6ý25ý
(/(&75,&ý+($7(56ý25ý81'(5ý:$7(5ý/,1(6ý25ý$,5ý
&21',7,21,1*ý(48,30(17ïý,167$//ý7+(ý(48,30(17ý,1ý$ý
5(675,&7('ý/2&$7,21ý72ý35(9(17ý$&&(66ý%<ý
81$87+25,=('ý3(56211(/ï
7+,6ý(48,30(17ý&203/,(6ý:,7+ý7+(ý5(48,5(0(176ý,1ý
3$57ýìèý2)ý)&&ý58/(6ý)25ý$ý&/$66ý$ý&20387,1*ý'(9,&(ïý
23(5$7,21ý2)ý7+,6ý(48,30(17ý,1ý$ý5(6,'(17,$/ý$5($ý
0$<ý&$86(ý,17(5)(5(1&(ý72ý5$',2ý$1'ý79ý5(&(37,21ñý
5(48,5,1*ý7+(ý23(5$725ý72ý7$.(ý:+$7(9(5ý67(36ý
1(&(66$5<ý72ý&255(&7ý7+(ý,17(5)(5(1&(ï
Содержание UPStation S3
Страница 1: ...POWER PROTECTION UPStation S3 Three Phase 12 kVA to 24 kVA 50 and 60 Hz User Manual ...
Страница 2: ......
Страница 6: ...iv ...
Страница 23: ...Installation 17 Figure 1 One Line Drawing Single Input Configuration 200 240V In Out ...
Страница 24: ...18 Installation Figure 2 One Line Drawing Dual Input Configuration 200 240V In Out ...
Страница 25: ...Installation 19 Figure 3 One Line Drawing Single Input Configuration With Neutral Isolation 200 240V In Out ...
Страница 26: ...20 Installation Figure 4 One Line Drawing Dual Input Configuration With Neutral Isolation 200 240V In Out ...
Страница 27: ...Installation 21 Figure 5 One Line Drawing Single Input Configuration 400 480 600V In 208V Out ...
Страница 28: ...22 Installation Figure 6 One Line Drawing Dual Input Configuration 400 480 600V In 208V Out ...
Страница 31: ...Installation 25 Figure 9 One Line Drawing Single Input Configuration 400 480 600V In Out ...
Страница 32: ...26 Installation Figure 10 One Line Drawing Dual Input Configuration 400 480 600V In Out ...
Страница 34: ...28 Installation Figure 12 One Line Drawing Dual Input Configuration With Neutral Isolation 400 480 600V In Out ...
Страница 35: ...Installation 29 Figure 13 Cabinet Dimensions ...
Страница 36: ...30 Installation Figure 14 Cabinet Dimensions With Transformer Cabinet ...
Страница 37: ...Installation 31 Figure 15 Connecting Terminal Details ...
Страница 38: ...32 Installation Figure 16 Connecting Terminal Details With Transformer Cabinet ...
Страница 39: ...Installation 33 Figure 17 Battery Option Details 12 Inch Cabinet ...
Страница 40: ...34 Installation Figure 18 Battery Option Details 24 Inch Cabinet ...
Страница 41: ...Installation 35 Figure 19 Field Lug Wiring Terminations ...
Страница 42: ...36 Installation Figure 20 Unloading Instructions ...
Страница 43: ...Installation 37 Figure 21 Unloading Instructions 24 Inch Battery Cabinet ...
Страница 44: ...38 Installation Figure 22 Battery Times ...
Страница 53: ...Operation 47 Figure 25 Configuration Menu Tree ...
Страница 55: ...Operation 49 Figure 26 Control Switch Locations ...
Страница 68: ...62 Features Options Figure 27 RS 232 Connections ...
Страница 69: ...Features Options 63 Figure 28 Output Distribution Panel Board ...