background image

Model details

Fig.2

Turning blinkers (dummy) for tramcar.

These should be stuck onto the tramcar frame at
(he appropriate pos

i

tions

.

Adhesive

:

UHU-Gree-

nit or UHU-Contact

2000

.

Fig.3

Each tramcar and trailer are fitted with

two lighting sockets for internallighting

,

they are

covered with imitation connecting leads

.

The

enclosed connecting lead will allow connections
to be made between the tramcar and its trailer

.

Fig

.

4

Platform guard

-

rails can be removed or

rearranged as required.

Fig.5

Bulbs can be easily replaced if one uses

the plastic

t

ube (as supplied with the LGB-Wine

Transport Wagon)

.

After the roof has been

removed

,

this being held in place by means of

snap-on lugs

,

the 2 bulbs

i

n the passenger

compartment can be replaced. Here one also
finds the changeover switch for the selection of
rail or overhead traction

.

F

i

g

.

6

When replacing the roof, ca re should be

taken to ensure that the electrical contacts cor-

respond

.

Spare parts:

2030/5 Complete motor block
2210

Contact shoes with springs

5050/1

Bulb 14-18 V, 50 mA.

~ Page 6 -

Heavy-Duty Universal Electric Locomotive
2040 electronic

Type

C'C',

RhB Ge

6/6

2040 ORIGINAL RhB 413
The Rhätische Railway (RhB)

The Rhätische Railway which has been
completely modernized during the past few
years, is the main rail thorough

f

are Graubün

-

dens

.

Its 394 kilometer long extensive track

layout, is the longest continuous narrow gauge
railway in Europe. It includes the most important

valleys, the Engadin and the landscapes of

Davos

,

Arosa and the Bündner uplands

.

The

main axis Chur- Thusis-Albula-Engadin

,

lead

further over the Bernina stretch into sunny Italy

,

from Veltlin to Tirano

.

The highlight of a trip on the

Albula line is the experience of the many spec

i

al

constructions:

over a distance of 12

.

6 km. the

track overcomes a difference in elevation of
416 meters

.

To achieve this

,

4 loop tunnels

,

4 tunnels, 7 viaducts and 2 galle ries were
necessary

.

Technical Data:

Engine Type RhB Ge

6/6

wheels C'C

.

The small

"Crocodile"

is a heavy universal electric

locomotive lor goods and passenger service

.

The

SLM

-

BBC delivered 15 locomotives 14 of which

are today

,

still being used in the southeast of

Switzerland on the higher alpine routes

.

Year of manufacture

1921-1929

.

Gauge

1000 mm. Locomotive weight 66 tons, 2 motors
1200 H.Power. Single-phase A.C

.

16

'V

3

Hz.

Max. speed 55 km./h. Overaillength

13.3 m.

Original true electric operation

Locomotives of the RhB and other European
Railway Comp. with 2 pantographs

,

use however

only one at any time. The second remains
lowered and is used only in case of emergency

.

Fundamentally,

the rear pantograph,

in the

direction of travel is used.

2040 Model

A super model with 2 motors

,

counter shaft axles

and connecting rod drive through 8 wheels

.

One

friction tyre wh ich increases the locomotive's
tractive power

.

11 different current collecting

points from tracks to the motors

.

Encapsulated

gearings, suitable for open air operation. First
class track holding in curved sections

,

also on the

tightest bends of the smallest LGB circular track

lay

-

out. Driver

'

s cab doors which can be opened,

complete with fittings and adjustable sliding
windows

.

Richly detailed roof with isolators and

open wiring

,

two pantographs for twin-train

operation on overhead lines these can be
switched over

.

Large separately fitted headlights for 3 lamp
signalling and driver

'

s cab internallighting

wh ich

automatically

change according to the direction

of travel.

Fig

.

1

On the turntable in the Landquart repair

yards

.

As on their original "Big Brothers

",

in addition to

the tripie signal headlights, the rear, right-hand

lantern is lit at night.
Length incl. buffers 460 mm.

Operating possibilities,

lighting

Fig

.

3

In driver's cab No. 1

,

mounted into the

rear of the control panel, one can find the

"

Type of

·

traction

"

selector switch

:

1

:

Overhead traction with lighting

0: Off position for track parking

,

lighting and

traction off.

2

:

Rail traction with lighting (Set to this position
before leaving the factory)

.

Bulb replacement

Fig

.

4

Middle headlight bulb

:

Snap-out the bulb

.

Lower headlight bulbs: Unscrew the bulb

-

holder

Driver

'

s cab internallighting

:

Unscrew the roof.

Don't cross the connecting leads! Correct order

when replacing, from left to right: brown with red
spot, brown, black, red

.

Spare bulb:

5015/1

Micro

-

bulb 5 volts, 33 mA.

-:-

Page 7 -

Fig

.

5

A sheet of renumbering

decals with the

locomotive numbers 411-415 and neutral
designations

is included with every locomotive

.

This allows an individuallocomotive

designation

.

Recommended

transformer

The Electric Locomotive 2040 is one of the
most powerfullocomotives

in the LGB

programme

.

To ensure a perfect operation we

recommended

the use of our Transformer

-

Controller-Combination

5006-5007 or

5006

-

5012

N.

The LGB-Locomotive

2040 is an authentic

scale model

01

the original "Big-Brother

"

.

It is

assembled from more than 600 separate parts
in the LGB-Factory

.

Care

The fulcrum points of the crank-shaft pins
should be occassionally

oiled, just like their

"Big-Brothers

".

Dismantling

In orer to replace the carbon brush current

collectors 2110

,

the contact shoes 2214 or the

friction tyre

2010/4

,

the gear-box must be

removed from the bogie frame

:

Fig

.

1

Dismantling should be carried out

i

n the

sequence 1-8:

1

.

Remove the right-hand crank eccentric cam

with connecting rod

.

2. as above, right-hand side

.

3

.

Remove the fixing screw of the gear-box

.

4

.

Remove coupling bridge

.

5

.

Unscrew snow plough

.

6

.

Remove gear

-

bQx from bogie frame - Friction

tyres and/or contact shoes can now be

replaced

.

7. In order to replace the carbon brushes

,

the

driving wheels shou

l

d be removed from the

axles

.

8

.

Replacement

carbon brushes with Springs

2110 should be fitted according to Assembly
Plan 6a

.

Fig

.

6a

The locomotive is fitted with two different

bogies which a

r

e marked underneath. The

Gear-box 2040 I is fitted under the d

r

iver

'

s cab

(by the coupling) and has

no

carbon brushes on

the friction tyred wheel.

Reassembly

of the bogie

~ don

'

t pitch any wires!

-

crank eccenter cams should point in the same
direction

,

-

on the opposite side

,

they shoUld be displaced

by900

,

-

fit intotheflats

in the wheel hubs, withoutforce

!

the connecting rods should have play after

being fitted

.

Spare parts:

5051

/

1 Plug-in m

i

cro-bulb 5 V

,

33 mA.

2040/5 Two complete motor-driven

bogies

.

2210

Contact shoes with springs

.

Page8

2045 Original RhB 205

The RhB-Locomotives

Ge

2/4

,

axle

arrangement

1'B1

',

Nos. 201-207

were among the first electric locomotives to be
put into serv

i

ce by the RhB during the course of

electrification

.

They were manufactured

in

1912

/

1913 by Messrs

.

SLM and BBC

.

A characteristic

of these

,

is the large

,

slow motion

Deri driving motor mounted in the motor housing.
Power drive w

i

thout intermediate

gearbox by

means of SLM-Diagonal

Rod Drive and

countershaft

axle onto the two connecting rods

.

Technical details:

Our original Locomotive No. 205

,

was put

i

nto

service for passenger and freight traffic

.

In 1929

,

end doors were subsequently

fitted.

Fig

.

5

Present where-abouts

:

on a rolling

-

stand

in the Engineer School in W

i

nterthur

.

Locomotive

207 is in the Transport House in Luzern

,

Switzerland.
Power

:

300 HP

.

Max

.

speed 45 km/h

,

ope

r

ational

weight 37 tons

,

length over buffers 8.7 m

.

2045 Model

Fig.2

An exact replica of the RhB-Original205

Locomot

i

ve

,

complete with all details

,

e

.

g

.

two

openable driver's cab doors with door closing
springs and adjustable sliding windows

.

Current collection via two driving wheels

,

rail

3

Содержание 1989

Страница 1: ...hem Stand zusammengestellt Ihnen Ratgeber und Helfer l r Ihr LGB Hobby sein schlie lich macht es mehr Spa wenn man Bescheid wei Vorwort Model technik der Elloks 2 Oberleitung Anschlu und Betrieb 3 203...

Страница 2: ...etzbar Demontage eines 2 Achsgetriebes 1 Schleifkontakte 2 Stromabnehmerkohlen 3 Getriebe ffnen 4 Schrauben l sen 4 Universal Hochleistungsmotor 5 Kugeldrucklager 6 Zahnrad mit Achse 2210 2110 2200 20...

Страница 3: ...em Fehler verfallen ein Umdrehen der Ellok w rde diese Zugfahrt richtung nach der anderen Seite erm glichen In diesem Falle w rde dieEllok ber den Scherenstromabnehmer keinen Strom bekom men Au erdem...

Страница 4: ...ihrer wei blauen Lackierung mit dem roten Fahrleitungsb gel f r funktionellen Oberleitungs betrieb ist diese kleine Lok nicht nur ein h bsches Schmuckst ck auf jeder LGB Anlage Sie hat auch einige Be...

Страница 5: ...iennummern Stationsbe zeichnungen f r die drehbaren Routentafeln rotwei e Warnbaken f r Arbeitstriebwagen und eine Menge europ ischer Stadtwappen Da Stra enbahngesellschaften im innerst dti schen Verk...

Страница 6: ...m der zweite bleibt gesenkt und dient lediglich als Reserve f r Notf lle Grunds tzlich ist in Fahrtrichtung gesehen immer der hintere Stromabnehmer an der Oberleitung 2040 Model Bild 2 Supermodell mit...

Страница 7: ...age Reihenfolge 1 Drehkurbelexzenter mit Kurbelstange rechts l sen 2 wie 1 links 3 Halteschraube t r Motorblock l sen 4 Kupplungsb gel entfernen 5 Schneer umer abschrauben 6 Motorblock aus Drehgestell...

Страница 8: ...ild leuchtet bei Nachtfahrt auch die hintere rechte Laterne Zwei Lichtsteckdosen f r Zugbe leuchtung 18 V Umschalter im Fahrerstand I f r Unter Oberleitungsbetrieb mit MittelsteIlung f r stromloses Ab...

Страница 9: ...erausnehmen 2120 Stromabnehmerkohle f r Lok Getriebe mit H lse und Feder Ersatzteile 2205 Motor mit 1 g ngiger Schnecke und eingebautem berlastschalter 040 mm Wellen 04 mm 2046 2 8 St ck Kupplungshake...

Страница 10: ...eitung Alle Metallteile der LGB Oberleitung Fahrdrahtausleger und Fahrleitungen sind aus nichtrostendem Material hergestellt und daher auch f r Freilandbetrieb bei jedem Wetter geeignet F r gute Strom...

Страница 11: ...verharzt nicht Inhalt des lers 12 2 ml Sie halten den I Pen wie einen Federhalter und kommen so sauber und ohne Flecken genau an die Stellen die Sie schmieren wollen Schon mit einem Tropfen erzielen...

Страница 12: ...ction reservees LGB Gleisanlagen und Technik Dipl Ing FH Robert M nzing ist der Autor des Lehmann offiziellen Handbuches ber die LGB Neben Gleisplanvorschl gen wird die ganze LGB Modellbahntechnik aus...

Страница 13: ...y who is an LGB enthusiast has overhead lines in his or her layout Overhead lines When one takes the trouble to build LGB over head lines to the layout then one becomes without special technical switc...

Страница 14: ...St Erhard Right from the start in 1913 two short electric locomotives of the type Bo were put into service They pulled passenger and freight trains mostly in mixed combinations Today this railway is...

Страница 15: ...lit at night Length incl buffers 460 mm Operating possibilities lighting Fig 3 In driver s cab No 1 mounted into the rear of the control panel one can find the Type of traction selector switch 1 Over...

Страница 16: ...ushes for locomotive with gear case and spring Spare parts 2205 Motor with single lead wormgear and built in overload switch dia 40 mm Shaft dia 4mm 2046 2 8 off Coupling hooks for a rack locomotive w...

Страница 17: ...the oil exactly where it is needed without smearing or unsightly stains This high quality oil penetrates into the smallest cracks and spreads over the complete bearing area so that a long lasting lubr...

Страница 18: ...its Exchange of experiences Conversions Hobbyist hints and tips Constructional Drawings Information regarding originals and museum pieces 56 Pages of art printed paper Size 21 x 30 cm Obtainable Singl...

Страница 19: ...teur 2218 2 charbons 211 0 2120 3 train de roues Le couvercle superieur doit etre seulement ouvert en cas de changement eventuel de moteur Choix de transformateurs Trans formateurl Regulateur Courantd...

Страница 20: ...circuit pour service a quatre trains Fig 6 La coupure des circuits a lieu par interruption bilaterale de la voie a I aide des eclisses isolantes 5026 ou d une voie d interruption 1015 T Par contre la...

Страница 21: ...r 4 tunnels 7 viaducs et 2 galeries Fig 1 Sur la plaque tournante du depot Landquart Caracteristiques techniques Locomotive du type RhB Ge 6 6 suite d essieux C C le petit crocodile une locomotive ele...

Страница 22: ...de chemin de fer de Sch llenen de voie metrique avec une longueur de 3 75 km fut inauguree le 12 juillet 1917 Ce chemin de fer electrifie a cremaillere relie la station G schenen du Saint Gotthard av...

Страница 23: ...plus difficile I amenee du courant aux frotteurs et roues de locomotives Fig 2 Le dispositif de nettoyage LGB 5005 represente ici un remede facile 11 peut etre adapte tout wagon deux essieux Le wagon...

Страница 24: ...usine le reenvoi sera effectue en principe contre remboursement 2110 2200 2210 2218 12 Page 12 Instructions de Service Abonnement Celui qui se donnera la peine d affranchir suffisamment frais de port...

Отзывы: