THE INDOOR UNIT INSTALLATION
43
ENGLISH
Evaluation of the performance
Operate the unit for 15~20 minutes, then
check the system refrigerant charge:
1
Measure the pressure of the gas side
service valve.
2
Measure the air temperature from inlet and
outlet of air conditioner.
3
Ensure the difference between the inlet
and outlet temperature is more than 8 °C.
4
For reference; the gas side pressure at
optimum condition is shown on table
(cooling)
The air conditioner is now ready to use.
* The feature can be changed according a
type of model.
2
Do not make drain piping like the
following.
* The feature can be changed according to
type of model.
Do not raise
Water
leakage
Tip of drain hose
dipped in water
Water
leakage
Ditch
Less than
50 mm gap
Accumulated
drain water
Air
Waving
Water
leakage
Discharge
temperature
Discharge air
Inlet temperature
Drain test
Use the following procedure to test the drain
pump operation:
- Set the air direction louvers up - and - down
to the position(horizontally) by hand.
- Pour a glass of water on the evaporator
using a kettle.
- Ensure the water flows through the drain
hose of the indoor unit without any leakage
and goes out the drain exit.
[Ceiling suspended type]
- Drain piping must have down-slope (1/50 to
1/100): be sure not to provide up - and -
down slope to prevent reversal flow.
- During drain piping connection, be careful
not to exert extra force on the drain port on
the indoor unit.
- Remove the rubber stopple before
connecting drain hose.
- Hook on the bracket after connecting the
drain hose as below.
Drain hose
Bracket