![LG B30AWYN7G5A Скачать руководство пользователя страница 70](http://html.mh-extra.com/html/lg/b30awyn7g5a/b30awyn7g5a_manual_1893055070.webp)
Ceiling Concealed Duct
18
_
Inverter 50Hz/R410A
Part 2 Product Data
n
Installation of PI485 for 42k/55k(PMNFP14A1)
• Fix PI485 to the bracket in the outdoor control box.(Figure 2)
• Connect PI485 to outdoor PCB and central controller with cable.(Figure 1,3)
- Connect CN-PWR to CN_CP(N) and CN_CP(L)
- Connect CN-OUT to SEN1_WH_J
• Separate AC and DC line when connecting the cable to outdoor PCB
- Use the clamp at the bracket to fix connection from CN_OUT to SEN1_WH_J
• Tie the cables with the tie-wraps and clamps after intalling PI485.
• Refer to PI485 installation manual for detailed installation method
CN_PWR(AC)
Centroller
controller
connector(DC)
CEN1_WH_J
CN_CP(L)
CN_CP(N)
CEN2_BL_J
CN_OUT(DC)
PI485
<Figure 1>
1. Installation
Содержание B30AWYN7G5A
Страница 1: ...Ceiling Concealed Duct Inverter 50Hz R410A 5CSB0 02B Replace 5CSB0 02A P No MFL49500009 ...
Страница 4: ...Part 1 General information 1 Models List 2 Nomenclature 3 Features Benefits Ceiling Concealed Duct ...
Страница 52: ...Part 3 Design and installation 1 Installation Ceiling Concealed Duct ...
Страница 75: ...Part 4 Accessories 1 Function of Remote Control 2 Central Control Devices Ceiling Concealed Duct ...