![LG B30AWYN7G5A Скачать руководство пользователя страница 68](http://html.mh-extra.com/html/lg/b30awyn7g5a/b30awyn7g5a_manual_1893055068.webp)
Ceiling Concealed Duct
16
_ Inverter
50Hz/R410A
Part 3 Design and installation
1. Installation
- Fix dry contact on the indoor control box cover.
- Connect dry contact(CN-CC) to Indoor PCB(CN-CC)
with cable.
- Use the DC line hole when connecting the cable to
indoor PCB.(Figure 2).
- Connect CN-POWER to power supplier.(Only AC 24V).
- Connect CN-DRY to dry contact controller. (Power sup-
plier and dry contact controller are produced locally.)
- Tie the cables with the tie-wraps and clamps. (Figure 2).
- Refer to dry contact installation manual for detailed
installation method.
Indoor PCB
Control box
Dry contact
Dry contact
cover
Control box cover
C
N
I
C
C
CN-POWER
CN-DRY
Screw
INDOOR PCB(DC)
DRY CONTACT
Controller (DC)
POWER SUPPLY (AC 24V)
CN-CC
Dry
Contact
(Figure 1)
6) ACCESSORY GUIDE (PQDSB1)
n
Dry Contact(Only AC 24V)
Содержание B30AWYN7G5A
Страница 1: ...Ceiling Concealed Duct Inverter 50Hz R410A 5CSB0 02B Replace 5CSB0 02A P No MFL49500009 ...
Страница 4: ...Part 1 General information 1 Models List 2 Nomenclature 3 Features Benefits Ceiling Concealed Duct ...
Страница 52: ...Part 3 Design and installation 1 Installation Ceiling Concealed Duct ...
Страница 75: ...Part 4 Accessories 1 Function of Remote Control 2 Central Control Devices Ceiling Concealed Duct ...