62 Room Air Conditioner
Troubleshooting Guide
Re-air Purging
(Re-installation)
• Procedure
(1) Confirm that both the liquid side valve and the
gas side valve are set to the closed position.
(2) Connect the charge set and a gas cylinder to
the service port of the Gas side valve.
– Leave the valve on the gas cylinder closed.
(3) Air purging.
– Open the valves on the gas cylinder and the
charge set. Purge the air by loosening the flare
nut on the liquid side valve approximately 45°
for 3 seconds then closing it for 1 minute;
repeat 3 times.
– After purging the air, use a torque wrench to
tighten the flare nut on liquid side valve.
(4) Check for gas leakage.
– Check the flare connections for gas leakage.
(5) Discharge the refrigerant.
– Close the valve on the gas cylinder and dis-
charge the refrigerant until the gauge indicates
3 to 5 kg/cm
2
g.
(6) Disconnect the charge set and the gas cylin-
der, and set the Liquid side and Gas side
valves to the open position.
– Be sure to use a hexagonal wrench to operate
the valve stems.
(7) Mount the valve stem nuts and the service
port nut.
– Use torque wrench to tighten the service port
nut to a torque of 1.8 kg.m.
– Be sure to check for gas leakage.
CAUTION: Do not leak the gas in the air
during Air Purging.
Lo
Closed
OPEN
Closed
Gas cylinder
R22
Outdoor unit
Indoor unit
Liquid side
Gas side
CLOSE
3-Way
valve
3-Way
valve
Содержание AS-W096QGG1
Страница 48: ...48 Room Air Conditioner Schematic Diagram Schematic Diagram Electric Control Device Indoor ...
Страница 49: ...Service Manual 49 Schematic Diagram Outdoor AS W096_Series AS W126_Series ...
Страница 50: ...50 Room Air Conditioner Schematic Diagram Outdoor AS W186_Series AS W246_Series ...
Страница 55: ...Service Manual 55 Schematic Diagram OUTDOOR MAIN P W B ASSEMBLY AS W096QGG1 AS W126RGH1 BOTTOM VIEW TOP VIEW ...
Страница 84: ...P No 3828A20195S February 2007 Printed in Korea ...