3. Evacuation
• Connect the charge hose end described in the pre-
ceding steps to the vacuum pump to evacuate the
tubing and indoor unit.
Confirm the "Lo" knob of the manifold valve is
open. Then, run the vacuum pump.
The operation time for evacuation varies with tub-
ing length and capacity of the pump. The following
table shows the time required for evacuation.
• When the desired vacuum is reached, close the
"Lo" knob of the manifold valve and stop the vacu-
um pump.
4. Finishing the job
• With a service valve wrench, turn the valve stem of
liquid side valve counter-clockwise to fully open
the valve.
• Turn the valve stem of gas side valve counter-
clockwise to fully open the valve.
• Loosen the charge hose connected to the gas side
service port slightly to release the pressure, then
remove the hose.
• Replace the flare nut and its bonnet on the gas
side service port and fasten the flare nut securely
with an adjustable wrench. This process is very
important to prevent leakage from the system.
• Replace the valve caps at both gas and liquid side
service valves and fasten them tight.
This completes air purging with a vacuum pump.
The air conditioner is now ready to test run.
(1) Remove the caps from the 2-way and 3-way
valves.
(2) Remove the service-port cap from the 3-way valve.
(3) To open the 2-way valve turn the valve stem coun-
terclockwise approximately 90°, wait for about 2~3
sec, and close it.
(4) Apply a soap water or a liquid neutral detergent on
the indoor unit connection or outdoor unit connec-
tions by a soft brush to check for leakage of the
connecting points of the piping.
(5) If bubbles come out, the pipes have leakage.
Soap water method
Required time for evacuation when 30 gal/h vacuum pump is
used
10 min. or more
15 min. or more
If tubing length is less than 10m
(33 ft)
if tubing length is longer than 10m
(33 ft)
Gas side
Liquid side
Cap
Hexagonal wrench
2-way valve
(Open)
3-way valve
(Close)
Indoor unit
Outdoor unit
Lo
Hi
Manifold valve
Vacuum pump
Pressure
gauge
Open
Close
Содержание AS-W096QGG1
Страница 48: ...48 Room Air Conditioner Schematic Diagram Schematic Diagram Electric Control Device Indoor ...
Страница 49: ...Service Manual 49 Schematic Diagram Outdoor AS W096_Series AS W126_Series ...
Страница 50: ...50 Room Air Conditioner Schematic Diagram Outdoor AS W186_Series AS W246_Series ...
Страница 55: ...Service Manual 55 Schematic Diagram OUTDOOR MAIN P W B ASSEMBLY AS W096QGG1 AS W126RGH1 BOTTOM VIEW TOP VIEW ...
Страница 84: ...P No 3828A20195S February 2007 Printed in Korea ...