Page 2 of 13
GEARDECK & GEARSPACE INSTALLATION
PRODUCT MODELS HGK819, HGK826, & H00604
STEP 1
STEP 2
The following steps are intended for Landing Gear installation on Lets Go Aero
GearSpace
and
GearDeck
Cargo Carriers only. For installation of Landing Gear on
GearCage, BlackBox, BigBox, or Moover Cargo Carriers
refer to
Page 7 of this manual.
The included Landing Gear Legs [
A
] are shipped in the
Nested position [Figure 1]. For assembly, the Legs must
be moved to the Deployed position [Figure 2].
For each Leg [
A
], pull the nested Legs outward to release
the spring loaded Engagement Tab [Figure 3].
Once released, swing to the Deployed position. [See Page
11 for more information on Landing Gear Nesting and
Deployment operation.]
Attached the one (1) Channel [
B
] to the
engagement side
of each
Landing Gear Leg [
A
] using the
Slot
located furthest in on the
Channel.
Fasten one (1) 3/8” x 1” Bolt (LG) [
G
], one (1) Nylon Spacer [
F
], one
(1) 3/8” Washer [
J
], and one (1) 3/8” Nylock Nut [
K
] per Landing Gear
Leg to secure the Channel [
B
] to the Leg [
A
].
NOTE:
The Nylon Spacer [
F
] should be installed between the
Channel [
B
] and the Landing Gear Leg [
A
] as shown. [Figure 4].
Nested
Deployed
[Figure 3]
[Figure 4]
[Figure 1]
[Figure 2]
A
A
A
A
F
J
K
B
G
Engagement
Tab
TOOLS REQUIRED: 9/16IN SOCKET & WRENCH
ENGAGEMENT
SIDE
SMOOTH
SIDE