Attention:
• Read
“Safety inspection checklist” on page iv
“Installation guidelines” on page 41
to ensure that you
work safely.
• Touch the static-protective package that contains the component to any unpainted metal surface on the
server; then, remove it from the package and place it on a static-protective surface.
Memory modules are sensitive to static discharge and require special handling. In addition to the standard
guidelines of
“Handling static-sensitive devices” on page 43
• Always wear an electrostatic-discharge strap when removing or installing memory modules. Electrostatic-
discharge gloves can also be used.
• Keep each memory module separated from one another. Do not stack memory modules directly on top of
each other during storage.
• Keep the gold memory module connector contacts from touching anything.
• Handle memory modules with care: never bend, twist, or drop a memory module.
Watch the procedure
A video of this procedure is available at YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
.
About this task
Step 1. Locate the memory module slots and determine memory module installation order based on
“Memory module installation rules” on page 44
.
Step 2. Make sure that both retaining clips on the memory module connector are in the open position.
a.
With the tip of a pointed tool, carefully press the retaining clips.
b.
Push the retaining clips outward on each end of the memory module slot.
Figure 89. Opening the memory module retaining clips
.
Hardware replacement procedures
113
Содержание ThinkSystem ST50 V2
Страница 1: ...ThinkSystem ST50 V2 Maintenance Manual Machine Types 7D8J and 7D8K ...
Страница 8: ...vi ThinkSystem ST50 V2 Maintenance Manual ...
Страница 48: ...40 ThinkSystem ST50 V2 Maintenance Manual ...
Страница 122: ...114 ThinkSystem ST50 V2 Maintenance Manual ...
Страница 182: ...174 ThinkSystem ST50 V2 Maintenance Manual ...
Страница 190: ...182 ThinkSystem ST50 V2 Maintenance Manual ...
Страница 191: ......
Страница 192: ......