NOTE: DIAGRAMS AND ILLUSTRATIONS ARE REPRESENTATIVE AND ARE NOT DRAWN TO SCALE.
www.LennoxHearthProducts.com
9
Firestop/Spacer (SV4.5HF) shown
on the exterior side of the wall. It
may also be installed on the
interior side.
Typical
Termination
Shown
7"
(178)
5-1/8"
(130 mm)
12-1/8"
(308 mm)
Note: Centerline of Vent Piping is
NOT the Same as the Centerline of
the Frame Opening.
6 to 48 inch Vent Section,
Telescopic vent section,
Elbow or Appliance Collar
Base of Appliance
3"
(76 mm)
1"
(25.4 mm)
Adapter
SV4.5RCH
10-1/2"
(267 mm)
Note: Centerline of vent piping
is NOT the same as centerline
of frame opening.
See FRAMING DIMENSIONS (previous page)
for min. distance to base of appliance.
(Appliance Base)
Figure 9-5: Exterior Wall Opening Framing
Figure 9-2
fireplace Left Side front Corner Shown
(Requirements are same for right side.)
Note: The nailing flanges, combustible
members, and screw heads in areas
directly adjacent to the nailing flanges
are EXEMPT from the 1/2-inch clearance-
to-combustible requirements for the
firebox outer wrapper. Combustible
framing may be in direct contact with the
nailing flanges and may be located closer
than 1/2 inch from screw heads and the
firebox wrapper in areas adjacent to the
nailing flanges. Frame the opening to the
exact dimensions specified in the framing
details.
Securing Unit to Framing by Unit Nailing Flanges
Left Front Corner of Fireplace Shown
(Right side requirements are the same)
Note: The nailing flanges, combustible members, and
screw heads directly adjacent to the nailing flanges
are EXEMPT from the 1/2" clearance-to-combustible
requirements for the firebox outer wrapper.
Combustible framing may be in direct contact with
the nailing flanges and may be located closer than
1/2" from screw heads and the firebox wrapper
in areas adjacent to the nailing flanges.
Frame the opening to the exact dimensions
specified in the framing details of this manual.
Nailing flanges are
provided at all four
corners at 1/2" to
1-1/2" settings,
in 1/4” increments.
Unit Nailing
Flanges
Side
Framing
SECURINg UNIT TO fRAMINg
By NAILINg fLANgES
UNIT NAILINg fLANgES
Unit ships from factory with nailing flanges in
vertical position for cleanface finish and at 1/2"
wall finish depth.
Cleanface finish Nailing flange Settings:
1. Leave vertical position of nailing flanges at
factory setting (see
Figure 9-1
, DETAIL A).
2. If wall finish material is thicker than 1/2", move
nailing flanges to applicable horizontal setting.
Surround/Bezel Nailing flange Settings:
1. Move vertical position of Top Nailing Flange
UP and Bottom Nailing Flange DOWN (see
Figure 9-1
, DETAIL B).
2. If wall finish material is thicker than 1/2", move
nailing flanges to applicable horizontal setting.
Figure 9-1
AdjUSTINg UNIT NAILINg fLANgES
Horizontal settings for
wall finish thickness:
1/2", 3/4", 1", 1-1/4", 1-1/2"
Top Nailing flange
(settings are same
for Bottom Flange)
1/2"
1-1/2"
Nailing flange
Vertical Setting
for Cleanface finish
Nailing flange
Vertical Setting
for Surround/Bezel
[DETAIL A]
[DETAIL B]
LENNOX HEARTH PRODUCTS • RHAPSODY™ LINEAR DIRECT-VENT GAS FIREPLACES (MODEL RHAP54N) • INSTALLATION INSTRUCTIONS
LOCATION ANd fRAMINg
(CONTINUEd)
ExTERIOR WALL OPENINg
fRAMINg
[Horizontal
Termination]
1. Locate the center of the vent outlet on the
exterior wall according to the di men -
sions shown in Figure 9-5.
2. Cut and/or frame an opening with inside
dimensions 10-1/2" (267 mm) wide x
12-1/8" (308 mm) high.
Figure 9-4: Ceiling Opening Framing
10-1/2” Min.
(267mm)
10-1/2” Min.
(267mm)
Plumb
Bob
Roof
Framing
Ceiling
Framing
CEILINg OPENINg fRAMINg
If the vertical vent will penetrate a ceiling, use a
plumb line from the ceiling above the appliance
to locate center of the vertical run. Cut and/or
frame an opening about this center mark with
10-1/2" x 10-1/2" (267 mm x 267 mm) inside
dimensions (Figure 9-4).
Note: Vertical firestop/Spacer must
be used anywhere vent pipe passes
through a combustible floor or
ceiling. Horizontal firestop/Spacer
must be used anywhere vent pipe
passes through a combustible wall.
See “Firestop/Spacer Requirements” on
Page 13 for details.
ROOf OPENINg fRAMINg dIMENSIONS
Pitch
C
d
0/12
10-1/2 in.
(267 mm)
10-1/2 in.
(267 mm)
6/12
10-1/2 in.
(267 mm)
12 in.
(305 mm)
12/12
10-1/2 in.
(267 mm)
17 3/4 in.
(451 mm)
C
D
Figure 9-3: Roof Opening Framing
ROOf OPENINg fRAMINg
[Vertical Termination]
Identify the location for the vent at the roof.
Cut and/or frame the opening per Figure 9-3.
Top
Nailing
flange
Bottom
Nailing
flange
Top
Nailing
flange
Bottom
Nailing
flange