background image

Hardware Installation Guidelines

30 — 

revision 7

M/5

M/5-E

M/5-P

M5-PX

M/5-PXN

M/5-PXNplus

Micro5

Micro5-E

Micro5-P

Micro5-PX

Micro5-PXN

Micro5-PXNplus

Mirco/5

Micro/5-E

Micro/5-P

Micro/5-PX

Micro/5-PXN

Micro/5-PXN

Micro/5-PXNplus

M5

M5-E

M5-P

M5-PX

M5-PX

M5-PXN

M5-PXNplus

M3000

M3000-PXNplus

M3PPMSP

M3PPMSP-DN

M3PPMPP

Multiple combinations of Lenel access hardware can be used within the UL approved enclosure.

The minimum configuration for the M Series consists of a UL approved enclosure and the LNL-3300-M5 
ISC.

For proprietary burglar alarm applications, the LNL-1100-20DI Input Control Module is required. For 
access control applications, one of the following is required:

Содержание LNL-3300-M5

Страница 1: ...7 3 M Series Installation Guide...

Страница 2: ...tegral Technologies Inc Portions of this product were created using LEADTOOLS 1991 2011 LEAD Technologies Inc ALL RIGHTS RESERVED Portions of this product are licensed under US patent 5 327 254 and fo...

Страница 3: ...be returned at the customer s expense All returns must have transportation insurance and custom brokers fees prepaid Liability It is expressly understood and agreed that the interface should only be u...

Страница 4: ......

Страница 5: ...ader Problems 24 4 3 Door Strike Problems 25 4 4 Contacting Technical Support 26 5 UL Certified Installations 27 5 1 Power 29 5 2 UL Certified Power Supplies 29 5 3 Typical Combinations for UL Install...

Страница 6: ...plication 50 11 Other Functions 51 11 1 Memory and Real Time Clock Backup Battery 51 11 2 Bulk Erase Function 51 12 Status LEDs 52 13 Specifications 53 LNL 1100 20DI Input Control Module 55 14 Overvie...

Страница 7: ...er Power Selection Jumper J5 92 31 Reader Wiring 94 31 1 LNL 1320 2RP to Reader Wiring 94 31 2 Door Position Monitor and REX Input Wiring 97 31 3 Door Strike Wiring 100 32 Status LEDs 106 33 Specifica...

Страница 8: ...LEDs 152 43 UL 294 Installations 153 44 Specifications 154 LNL 1380 8RP Reader Interface Module 155 45 Overview of the LNL 1380 8RP 157 46 Configuration 159 46 1 Setting the Device Address and Baud R...

Страница 9: ...HARDWARE INSTALLATION GUIDELINES...

Страница 10: ......

Страница 11: ...controller boards All boards plug into the controller backplane making field configuration and maintenance easy and economical The Lenel M Series additionally incorporates flash memory technology tha...

Страница 12: ...on page 17 5 Mount and install the battery backup Refer to Installing the Battery Backup on page 19 6 Wire up the LNL 3300 M5 ISC Be sure to configure and verify the switch settings Refer to Wiring on...

Страница 13: ...g and terminate properly Notes This is an FCC Class A product In a domestic environment this product may cause radio interference in which case the user may be required to take adequate measures Circu...

Страница 14: ...ce sources Avoid excess cable length between the M5 controller and the optional equipment such as readers and digital outputs to reduce signal degradation due to external effects 2 5 Mounting Read the...

Страница 15: ...holes 4 Using customer furnished 1 4 in 6 mm threaded lag bolts or equivalent and washers secure the enclosure to the wall Replace the card cage 5 If required install cable conduit to the enclosure k...

Страница 16: ...ssembly Drawing in Standard Enclosure Callouts Callout Description 1 Mounting surface 2 Lenel M Series enclosure 3 Tamper switch 4 Card cage for printed circuit boards 5 Slot J7 6 LNL 3300 M5 in Slot...

Страница 17: ...he power supply as close to the controller enclosure as possible 2 Run the wire through the knockout hold to the following terminals on the LNL 3300 M5 ISC TB1 3 VIN 12 VDC TB1 4 GND 12 VDC return Con...

Страница 18: ...g AC grounding is a critical element for proper operation Connect the GND signal to earth ground in one location within the system Multiple earth ground connections are not recommended and can cause g...

Страница 19: ...nel M Series when AC power is lost Figure X shows a typical wiring between a battery backup power supply and an LNL 3300 M5 ISC For specific wiring information refer to the documentation supplied with...

Страница 20: ...nse line that is low GND meaning no AC power failure 3 Battery connections 4 12 VDC output connections 5 AC power fail connections Normally Closed contacts only 6 LNL 1100 20DI Input Output Module TB1...

Страница 21: ...the conduit is inaccessible With this option the user cannot determine which controller enclosure is reporting the alarm Wire the tamper and power fault switches to available inputs on the LNL 1100 20...

Страница 22: ...1 12V TB2 2 GND Reader Port 4 TB2 5 12V TB2 6 GND Reader Port 5 TB3 1 12V TB3 2 GND Reader Port 6 TB3 5 12V TB3 6 GND Reader Port 7 TB4 1 12V TB4 2 GND Reader Port 8 TB4 5 12V TB4 6 GND Result A measu...

Страница 23: ...Make sure the LNL 3300 M5 is seated properly into the backplane and that no pins are bent on J6 the 48 pin connector 4 Disconnect the power input connector from TB1 on the LNL 3300 M5 Remove the LNL...

Страница 24: ...2RP board and the reader Refer to Reader Wiring on page 94 and the reader installation manual 4 Make sure the connectors are firmly seated in TB1 Reader Port 1 and TB3 Reader Port 2 on the LNL 1320 2R...

Страница 25: ...d Rate on page 113 3 Check the wiring between the reader and the LNL 1320 S2RP Refer to Reader Wiring on page 116 and the reader installation manual 4 2 3 Using the LNL 1380 8RP Problem The reader doe...

Страница 26: ...this product refer to this document and any other documentation provided If you still have questions contact Lenel Technical Support during normal business hours Monday through Friday excluding holid...

Страница 27: ...r SQL 2012 Express Oracle 12cR1 Server 64 bit 12 1 0 1 with 32 bit Client installed if OnGuard is running on the same server as the database Access control proprietary burglary systems OnGuard 7 x 7 x...

Страница 28: ...system This allows 30 seconds for the backup system to be fully energized and connected to the necessary communication lines and other devices followed by 5 1 2 minutes for the system to boot up cond...

Страница 29: ...ess as low voltage lines 5 2 UL Certified Power Supplies For the UL certification the power supply that must be used is the LNL AL400ULX or LNL AL600ULX 4CB6 with additional hardware mounted in LNL CT...

Страница 30: ...M5 P M5 PX M5 PX M5 PXN M5 PXNplus M3000 M3000 PXNplus M3PPMSP M3PPMSP DN M3PPMPP Multiple combinations of Lenel access hardware can be used within the UL approved enclosure The minimum configuration...

Страница 31: ...ic access control system operating on commercial power must be provided with a capacity of 7 Ah to 12 Ah to support a full load for a period of 30 minutes Class II Front and rear tampers must be used...

Страница 32: ...y If the door strike circuit is arranged as fail secure door remains locked upon loss of power listed emergency panic hardware must be provided to allow exit from the secured area A fail safe configur...

Страница 33: ...LNL 3300 M5 INTELLIGENT SYSTEM CONTROLLER...

Страница 34: ......

Страница 35: ...re stored in flash memory The event log buffer is stored in battery backed memory The LNL 3300 M5 communicates with the host via on board 10 BaseT 100Base TX Ethernet port The alternate host communica...

Страница 36: ...tery BR CR2325 BR CR2330 replace annually 5 Standoff mounting holes for optional Lantronix Micro125 Serial to Ethernet Module 0 125 x 7 16 long 3 required Richo Inc P N LMSP 7 01 6 TB1 Input power enc...

Страница 37: ...To ensure that the default login account is properly disabled Ensure that at least one user defined account exists on the controller with different credentials than the default login account DIP SW1 i...

Страница 38: ...ches are set to the normal operating mode If at least one user defined account has been created If either check fails an appropriate error message appears see Error Warning Messages on page 38 for det...

Страница 39: ...on Guide revision 7 39 Login Failed Login Time Window Expired The No User defined Accounts screen appears when you successfully log into the controller but no user defined accounts are detected No Use...

Страница 40: ...settings or user defined account fails the Configuration Manager screen appears Configuration Manager If either or both condition exists you must acknowledge the appropriate warning by checking the b...

Страница 41: ...fault communication parameters Network Static IP Address 192 168 0 251 Gateway Mask 255 255 255 0 Communication Address 0 Primary Host Port IP server no data security Port 3001 Alternate Host Port Dis...

Страница 42: ...HLAN LITE ETHLAN MICR come in a separate package The following diagram illustrates the positioning Richco plastic P N LMSP 7 01 8 3 ETHLAN MICR Addressing The ETHLAN LITE ETHLAN MICR device should be...

Страница 43: ...the device acknowledge the IP assignment There should be replies from the IP address if the ARP command was accepted Note The ETHLAN MICR will not save this learned IP address permanently this proced...

Страница 44: ...on After a factory default reset the following changes must be made 1 At the prompt type set privileged and press Enter 2 Type in the password system and press Enter 3 Determine and set the IP address...

Страница 45: ...M5 enclosures This interface allows multi drop communication on a single bus of up to 4 000 feet 1 200 m Use shielded twisted pair minimum 24 AWG cable with 120 ohm impedance Notes Install termination...

Страница 46: ...re Tamper and Power Fault Input Wiring Notes Connect the GND signal to earth ground in one location within the system Multiple earth ground connections can cause ground loop problems and are not recom...

Страница 47: ...irst time use the default user name admin and password password to configure the ISC Notes After configuring the LNL 3300 M5 using the web interface make sure to place DIP switch SW1 in the OFF positi...

Страница 48: ...ftware even for IP communications b Configure the following Connection Type Choose from IP Server Serial RS232 Serial modem Serial RS485 LNL 3300 M5 only and Serial Cobox LNL 3300 M5 only Currently th...

Страница 49: ...characters _ Characters and are invalid characters and cannot be used for passwords c Specify the Session Timer 5 to 60 minutes Click Save d You may disable the web server by selecting the check box...

Страница 50: ...hen you have completed configuring the device click Apply Settings Apply Settings Reboot and then Log Out If the IP address has changed you will need to log in with the new IP address to continue 10 2...

Страница 51: ...e all configuration and cardholder database sanitize board Update OEM default parameters after OEM code has been changed Recover from database corruption causing the LNL 3300 M5 to continuously reboot...

Страница 52: ...econds to the initialization When LED s 1 through 4 flash at the same time data is written to or read from flash memory Note Do not cycle power while data is written to or read from the flash memory R...

Страница 53: ...onous Inputs Two 2 non supervised dedicated for cabinet tamper and power fault monitoring Cable Requirements Power One 1 twisted pair 18 AWG RS 485 24 AWG 4 000 ft 1 200 m maximum shielded twisted pai...

Страница 54: ...LNL 3300 M5 Intelligent System Controller 54 revision 7...

Страница 55: ...LNL 1100 20DI INPUT CONTROL MODULE...

Страница 56: ......

Страница 57: ...hrough 10IN The second processor B monitors inputs 11IN through 20IN This board occupies two consecutive addresses on the communication bus LNL 1100 20DI Input Control Module LNL 1100 20DI Input Contr...

Страница 58: ...8 revision 7 4 Inputs monitored by Processor B Communication address defined by S1 incremented by one 5 Inputs monitored by Processor A Communication address defined by S1 LNL 1100 20DI Input Control...

Страница 59: ...used to enable encrypted communication All other configuration settings are set via host software LNL 1100 20DI DIP Switch Settings Selection S8 S7 S6 S5 S4 S3 S2 S1 Address 0 OFF OFF OFF OFF OFF Addr...

Страница 60: ...N ON OFF OFF ON Address 26 ON ON OFF ON OFF Address 27 ON ON OFF ON ON Address 28 ON ON ON OFF OFF Address 29 ON ON ON OFF ON Address 30 ON ON ON ON OFF Address 31 DO NOT USE ON ON ON ON ON 115 200 bp...

Страница 61: ...circuit conditions open circuit shorted circuit grounding of either side of the circuit the introduction of a foreign voltage Grounded and foreign voltage states are not UL 294 required and therefore...

Страница 62: ...or TB1 through TB4 Callouts Callout Description 1 Standard supervised circuit normally closed contact 2 Standard supervised circuit normally open contact 3 Unsupervised circuit normally closed contact...

Страница 63: ...A1 B1 Heartbeat and online status Offline 1 second cycle 200 mS ON 800 mS OFF Online non encrypted communication Flash cycle of 800 mS ON 200 mS OFF Online encrypted communication 4 flash cycles of 70...

Страница 64: ...s 20 unsupervised supervised Standard EOL 1K 1K ohm 1 1 4 watt Communication 9600 19200 38400 or 115200 bps asynchronous Alarm Input Cable Requirements 1 twisted pair per input 22 AWG shielded 30 ohms...

Страница 65: ...LNL 1200 16DO OUTPUT CONTROL MODULE...

Страница 66: ......

Страница 67: ...C power source is common to all outputs LNL 1200 16DO Digital Output Control Module LNL 1200 16DO Digital Output Control Module Callouts Callout Description 1 Output status LED 16 places 2 J2 to backp...

Страница 68: ...LNL 1200 16DO Output Control Module 68 revision 7 3 Status LEDs 4 External power source 24 VDC maximum 5 DIP switches LNL 1200 16DO Digital Output Control Module Callouts Callout Description...

Страница 69: ...ngs are set in the host software DIP Switch Settings for the LNL 1200 16DO Selection S1 S2 S3 S4 S5 S6 S7 S8 Address 0 OFF OFF OFF OFF OFF Address 1 ON OFF OFF OFF OFF Address 2 OFF ON OFF OFF OFF Add...

Страница 70: ...ON OFF OFF ON ON Address 26 OFF ON OFF ON ON Address 27 ON ON OFF ON ON Address 28 OFF OFF ON ON ON Address 29 ON OFF ON ON ON Address 30 OFF ON ON ON ON Address 31 ON ON ON ON ON 115 200 bps OFF OFF...

Страница 71: ...t protection circuit Locate the protection circuit as close to the load as possible 12 inches 30cm recommended The circuit s effectiveness decreases if it is located further away For The external rela...

Страница 72: ...4x strike voltage 12 VDC or 24 VDC strike use diode 1N4002 100 V 1A typical 5 Coil resistance 125 ohm minimum 6 Suppression diode see Suppression Diode Selection Notes below 7 5 to 24 VDC 40 mA maxim...

Страница 73: ...1 Heartbeat and online status Offline 1 second cycle 200 mS ON 800 mS OFF Online non encrypted communication Flash cycle of 800 mS ON 200 mS OFF Online encrypted communication 4 flash cycles of 700 m...

Страница 74: ...12 VDC 10 30 mA maximum Power for Digital Outputs 24 VDC maximum 640 mA maximum Communication 9600 19200 38400 or 115200 bps asynchronous Output Cable Requirements As required for the load Environmen...

Страница 75: ...LNL 1200 16DOR OUTPUT CONTROL MODULE...

Страница 76: ......

Страница 77: ...ternal DC power source is common to all outputs LNL 1200 16DOR Relay Output Control Module LNL 1200 16DOR Relay Output Control Module Callouts Callout Description 1 J6 to backplane in enclosure card c...

Страница 78: ...LNL 1200 16DOR Output Control Module 78 revision 7 3 DIP switches LNL 1200 16DOR Relay Output Control Module Callouts Callout Description...

Страница 79: ...ngs are set in the host software DIP Switch Settings for the LNL 1200 16DOR Selection S1 S2 S3 S4 S5 S6 S7 S8 Address 0 OFF OFF OFF OFF OFF Address 1 ON OFF OFF OFF OFF Address 2 OFF ON OFF OFF OFF Ad...

Страница 80: ...ON OFF OFF ON ON Address 26 OFF ON OFF ON ON Address 27 ON ON OFF ON ON Address 28 OFF OFF ON ON ON Address 29 ON OFF ON ON ON Address 30 OFF ON ON ON ON Address 31 ON ON ON ON ON 115 200 bps OFF OFF...

Страница 81: ...etic interference which may interfere with normal operation of other equipment To minimize premature contact failure and to increase system reliability use a contact protection circuit Locate the prot...

Страница 82: ...13 TB4 1 TB4 2 TB4 3 Normally Closed NC Common C Normally Open NO 14 TB4 4 TB4 5 TB4 6 Normally Closed NC Common C Normally Open NO 15 TB4 7 TB4 8 Common C Normally Open NO 16 TB4 9 TB4 10 Common C N...

Страница 83: ...tion Notes Clamp voltage 1 5x VAC RMS For 24 VAC strike Panasonic ERZ C07DK470 typical 3 Fuse 4 TB1 on LNL 1200 16DOR 5 Suppression diode see Suppression Diode Selection Notes below AC Door Strike Wir...

Страница 84: ...4 LED 1 Heartbeat and online status Offline 1 second cycle 200 mS ON 800 mS OFF Online non encrypted communication Flash cycle of 800 mS ON 200 mS OFF Online encrypted communication 4 flash cycles of...

Страница 85: ...s 24 VDC maximum 640 mA maximum Relay Contacts Eight 8 Form C 2 A 30 VAC DC resistive Eight 8 Form A 2 A 30 VAC DC resistive Communication 9600 19200 38400 or 115200 bps asynchronous Output Cable Requ...

Страница 86: ...LNL 1200 16DOR Output Control Module 86 revision 7...

Страница 87: ...LNL 1320 2RP DUAL DOOR CONTROL MODULE...

Страница 88: ......

Страница 89: ...inputs for door position monitoring and request to exit REX The LNL 1320 2RP also has three Form C relay outputs used for strike control alarm contact shunting and auxiliary device control for each r...

Страница 90: ...RP Dual Door Control Module 90 revision 7 2 J6 to backplane in enclosure card cage 3 Status LEDs 4 DIP switches 5 Reader Port 2 6 Reader Port 1 LNL 1320 2RP Dual Door Control Module Callouts Callout D...

Страница 91: ...ches 6 and 7 to the ON position Switch 8 enables encrypted communication All other configuration settings are set in the host software DIP Switch Settings for the LNL 1320 2RP Selection S1 S2 S3 S4 S5...

Страница 92: ...OFF OFF ON Address 19 ON ON OFF OFF ON Address 20 OFF OFF ON OFF ON Address 21 ON OFF ON OFF ON Address 22 OFF ON ON OFF ON Address 23 ON ON ON OFF ON Address 24 OFF OFF OFF ON ON Address 25 ON OFF O...

Страница 93: ...on Guide revision 7 93 J5 Reader Power Selection J5 Reader Power Selection Callouts Callout Description 1 5 VDC is available on both reader interface ports 2 12 VDC is available on both reader interfa...

Страница 94: ...2F and supervised F 2F readers require a shielded 4 conductor cable Clock Data and Wiegand readers require a shielded 5 conductor cable Reader port configuration is defined by the host software 31 1...

Страница 95: ...Callouts Callout Description 1 Magnetic reader 2 TB1 or TB3 on LNL 1320 2RP 3 Terminal 1 5 VDC 12 VDC connection 4 Terminal 2 Ground connection 5 Terminal 4 Door DO Reader LED connection 6 Terminal 6...

Страница 96: ...allout Description 1 F 2F reader 2 TB1 or TB3 on LNL 1320 2RP 3 Terminal 1 5 VDC 12 VDC connection 4 Terminal 2 Ground connection 5 Terminal 4 Door DO Reader LED connection 6 Terminal 7 Data 1 connect...

Страница 97: ...in several different configurations These configurations are downloaded from the host and may be changed Supervised F 2F Reader Callouts Callout Description 1 Supervised F 2F reader 2 TB1 or TB3 on LN...

Страница 98: ...ired to the F 2F Reader Unsupervised inputs for the door position monitor and REX switches are wired directly to the F 2F reader configured for 2 State Supervision See the reader s documentation for t...

Страница 99: ...documentation for the proper connection terminals EOL resistors typically require two 1K ohm resistors as shown in the figure below Install the EOL resistors as close to the switch as possible Unsuper...

Страница 100: ...Wiring Each reader port on the LNL 1320 2RP has three Form C contact relays for controlling door strikes or other devices Relay contact rating 2 A 30 VAC DC maximum Supervised Input Wiring on F 2F Re...

Страница 101: ...arge gauge wire for the load current to avoid voltage loss AC Door Strike Wiring Suppression MOV selection Clamp voltage 1 5x VAC RMS For 24 VAC strike Panasonic ERZ C07DK470 typical Internal Relay De...

Страница 102: ...ssion diode selection Diode current rating 1x strike current Diode breakdown voltage 4x strike voltage For 12 VDC or 24 VDC strike use diode 1N4002 100 V 1 A typical AC Door Strike Wiring using Intern...

Страница 103: ...l relay s coil current must be restricted to 40 mA The 5 volt relay coil resistance must be 125 or greater ohms The 12 volt relay coil resistance must be 300 or greater ohms Note Excessive load switch...

Страница 104: ...Wiring using External Relay Callouts Callout Description 1 AC strike 2 AC transformer 3 Fuse 4 External relay 5 TB1 or TB3 on LNL 1320 2RP 6 Terminal 1 5 VDC 12 VDC connection for LNL 1320 2RP 7 Term...

Страница 105: ...Description 1 DC strike 2 To DC power source 3 Fuse 4 External relay 5 TB1 or TB3 on LNL 1320 2RP 6 Terminal 1 5 VDC 12 VDC connection for LNL 1320 S2RP 7 Terminal 4 Reader LED connection 8 Suppressi...

Страница 106: ...ine 1 second cycle 200 mS ON 800 mS OFF Online non encrypted communication Flash cycle of 800 mS ON 200 mS OFF Online encrypted communication 4 flash cycles of 700 mS ON 300 mS OFF Error indication Wa...

Страница 107: ...ts As required for the load Reader Data Use shielded cables 5 VDC 18 AWG 200 ft maximum reader powered by reader processing board 12 VDC 20 AWG 500 ft maximum reader powered by LNL 1320 2RP 18 AWG 300...

Страница 108: ...LNL 1320 2RP Dual Door Control Module 108 revision 7...

Страница 109: ...LNL 1320 S2RP DUAL DOOR CONTROL MODULE...

Страница 110: ......

Страница 111: ...nterface ports provides inputs for door position monitoring and request to exit REX The LNL 1320 S2RP also has three Form C relay outputs used for strike control alarm contact shunting and auxiliary d...

Страница 112: ...P Dual Door Control Module 112 revision 7 2 J6 to backplane in enclosure card cage 3 Status LEDs 4 DIP switches 5 Reader Port 2 6 Reader Port 1 LNL 1320 S2RP Dual Door Control Module Callouts Callout...

Страница 113: ...tches 6 and 7 to the ON position Switch 8 enables encrypted communication All other configuration settings are set in the host software DIP Switch Settings for the LNL 1320 S2RP Selection S1 S2 S3 S4...

Страница 114: ...OFF OFF ON Address 19 ON ON OFF OFF ON Address 20 OFF OFF ON OFF ON Address 21 ON OFF ON OFF ON Address 22 OFF ON ON OFF ON Address 23 ON ON ON OFF ON Address 24 OFF OFF OFF ON ON Address 25 ON OFF O...

Страница 115: ...n Guide revision 7 115 J5 Reader Power Selection J5 Reader Power Selection Callouts Callout Description 1 5 VDC is available on both reader interface ports 2 12 VDC is available on both reader interfa...

Страница 116: ...130 F 2F and supervised F 2F readers require a shielded 4 conductor cable Clock Data and Wiegand readers require a shielded 5 conductor cable Reader port configuration is defined by the host software...

Страница 117: ...eader Callouts Callout Description 1 Magnetic reader 2 TB1 or TB3 on LNL 1320 S2RP 3 Terminal 1 5 VDC 12 VDC connection 4 Terminal 2 Ground connection 5 Terminal 4 Door DO Reader LED connection 6 Term...

Страница 118: ...uts Callout Description 1 F 2F reader 2 TB1 or TB3 on LNL 1320 S2RP 3 Terminal 1 5 VDC 12 VDC connection 4 Terminal 2 Ground connection 5 Terminal 4 Door DO Reader LED connection 6 Terminal 7 Data 1 c...

Страница 119: ...ired in several different configurations These configurations are downloaded from the host and may be changed Supervised F 2F Reader Callouts Callout Description 1 Supervised F 2F reader 2 TB1 or TB3...

Страница 120: ...o the switch as possible to maximize supervision s effectiveness In addition to detecting contact open or contact closed the LNL 1320 S2RP also monitors for the following abnormal circuit conditions o...

Страница 121: ...r s documentation for the proper connection terminals End Of Line EOL resistors are not required 3 Normally Closed contact for door monitor switch Supervised Input Wiring with 6 8K 18K EOL Callouts Ca...

Страница 122: ...See the reader s documentation for the proper connection terminals EOL resistors typically require two 1K ohm resistors as shown in the figure below Install the EOL resistors as close to the switch as...

Страница 123: ...ng Each reader port on the LNL 1320 S2RP has three Form C contact relays for controlling door strikes or other devices Relay contact rating 2 A 30 VAC DC maximum Supervised Input Wiring on F 2F Reader...

Страница 124: ...tly large gauge wire for the load current to avoid voltage loss AC Door Strike Wiring Suppression MOV selection Clamp voltage 1 5x VAC RMS For 24 VAC strike Panasonic ERZ C07DK470 typical Internal Rel...

Страница 125: ...diode selection Diode current rating 1x strike current Diode breakdown voltage 4x strike voltage For 12 VDC or 24 VDC strike use diode 1N4002 100 V 1 A typical AC Door Strike Wiring using Internal Rel...

Страница 126: ...ternal relay s coil current must be restricted to 40 mA The 5 volt relay coil resistance must be 125 or greater ohms The 12 volt relay coil resistance must be 300 or greater ohms Note Excessive load s...

Страница 127: ...iring using External Relay Callouts Callout Description 1 AC strike 2 AC transformer 3 Fuse 4 External relay 5 TB1 or TB3 on LNL 1320 S2RP 6 Terminal 1 5 VDC 12 VDC connection for LNL 1320 S2RP 7 Term...

Страница 128: ...s Callout Description 1 DC strike 2 To DC power source 3 Fuse 4 External relay 5 TB1 or TB3 on LNL 1320 S2RP 6 Terminal 1 5 VDC 12 VDC connection for LNL 1320 S2RP 7 Terminal 4 Reader LED connection 8...

Страница 129: ...second cycle 200 mS ON 800 mS OFF Online non encrypted communication Flash cycle of 800 mS ON 200 mS OFF Online encrypted communication 4 flash cycles of 700 mS ON 300 mS OFF Error indication Waiting...

Страница 130: ...Outputs As required for the load Reader Data Use shielded cables 5 VDC 18 AWG 200 ft maximum reader powered by reader processing board 12 VDC 20 AWG 500 ft maximum reader powered by LNL 1320 2RP 18 AW...

Страница 131: ...LNL 1340 M2K FOUR READER INTERFACE MODULE...

Страница 132: ......

Страница 133: ...er devices The LNL 3300 M5 Intelligent System Controller board can be mounted directly on the LNL 1340 M2K board The LNL 1340 M2K can only be installed in an M2000 enclosure If the LNL 3300 M5 board i...

Страница 134: ...th Mounting Screws two 2 each 6 LNL 3300 M5 Status LEDs 7 LNL 1340 MK Status LEDs 8 LNL 3300 M5 DIP Switches 2 6 4 5 3 1 JP1 TB7 JP2 LO HI K8 K7 K6 K5 K4 K3 K2 K1 K8 K7 K6 K5 K4 K3 K2 K1 TB12 TB11 TB1...

Страница 135: ...TB6 PIN 1 Reader 4 17 Internal Ground Stub two 2 places 18 TB7 PIN 1 Downstream Communication Port 1 RS 485 Termination 19 JP1 Port 1 RS 485 Termination 20 JP2 Set to Lo 21 TB8 PIN 1 Power Connection...

Страница 136: ...to Ethernet Module 4 Battery BR CR2325 BR CR2330 replace annually 5 Standoff mounting holes for optional Lantronix Micro125 Serial to Ethernet Module 0 125 x 7 16 long 3 required Richo Inc P N LMSP 7...

Страница 137: ...he LNL 3300 M5 board before mounting it to the LNL 1340 M2K board Install two 2 mounting screws 7b in the holes made vacant from the card puller 7b Mounting Screws 2 places 8 TB2 RS 485 to downstream...

Страница 138: ...switches 6 and 7 to the ON position Switch 8 enables encrypted communication All other configuration settings are set via the host software DIP Switch Settings for the LNL 1340 M2K Selection S1 S2 S3...

Страница 139: ...input for cabinet tamper connected to TB8 5 and TB8 6 Normal safe condition is a closed contact Address 17 ON OFF OFF OFF ON Address 18 OFF ON OFF OFF ON Address 19 ON ON OFF OFF ON Address 20 OFF OFF...

Страница 140: ...rnet Grounding The grounding lug on the LNL 3300 M5 identified as CGND located next to the Ethernet jack must be connected to the chassis earth ground stud on the M2000 enclosure It is recommended to...

Страница 141: ...0 M2K TB2 of the LNL 3300 M5 is the 2 wire RS 485 downstream communication port 2 that can communicate to an additional 32 downstream I O devices 41 2 Reader Wiring Each of the four 4 reader ports on...

Страница 142: ...F Reader Wiring LNL 1340 M2K to F 2F or Supervised F 2F Reader Wiring Callouts Callout Description 1 F 2F reader 2 TBx on LNL 1340 M2K 3 TBx 1 12 VDC connection 4 TBx 2 Ground connection 5 TBx 3 Door...

Страница 143: ...t For the LNL 1340 M2K Reader Interface Module the door position monitor and REX switches are wired to the F 2F reader These configurations are downloaded from the host and may be changed Supervised I...

Страница 144: ...igured for 2 State Supervision See the reader s documentation for the proper connection terminals End of Line EOL resistors are not required Supervised F 2F Reader 4 State Input Wiring Callouts Callou...

Страница 145: ...supervision the LNL 1340 M2K board also monitors the following abnormal circuit conditions open circuit shorted circuit grounding of either side of the circuit or the introduction of a foreign voltage...

Страница 146: ...Input Wiring Supervised and Non supervised Warning Door position monitor and REX inputs must be wired to the LNL 1340 M2K when using F 2F readers EOL resistors are typically two 1K ohm resistors as s...

Страница 147: ...urrent must be restricted to 40 mA The 12 volt relay coil resistance must be 300 or greater ohms DC Door Strike Wiring Suppression diode selection Diode current rating 1x strike current Diode breakdow...

Страница 148: ...sonic ERZ C07DK470 typical DC Door Strike Wiring using External Relay Callouts Callout Description 1 DC strike 2 To DC power source 3 Fuse 4 External relay 5 TB1 on LNL 1340 M2K 6 Terminal 1 12 VDC co...

Страница 149: ...terference which may interfere with normal operation of other equipment To minimize premature contact failure and to increase system reliability a contact protection circuit must be used Locate the pr...

Страница 150: ...x strike voltage For 12 VDC or 24 VDC strike use diode 1N4002 100 V 1 A typical DC Door Strike Wiring Internal Relay LNL 1340 M2K Relay Terminal Block Definitions TB9 Relays K1 K2 TB10 Relays K3 K4 TB...

Страница 151: ...ng Internal Relay DC Door Strike Wiring Internal Relay Callouts Callout Description 1 DC strike 2 To DC power source 3 Fuse 4 TB9 TB10 TB11 and TB12 on LNL 1340 M2K 5 Suppression diode AC Door Strike...

Страница 152: ...r indication Waiting for firmware to download flash cycle of 100 mS ON 100 mS OFF LED 2 SIO communication port status indicates activity on the communication port LED 3 Reader Port 1 Flashes when rece...

Страница 153: ...on Guide revision 7 153 43 UL 294 Installations For UL294 installations the LNL 1340 M2K has been evaluated to the following Model Destructive Attack Line Security Encryption Endurance Standby Power L...

Страница 154: ...Inputs 1 twisted pair per input 22 AWG shielded 30 ohms maximum loop resistance Outputs As required for the load Reader Data Use shielded cables 12 VDC 20 AWG 500 ft maximum reader powered by LNL 1340...

Страница 155: ...LNL 1380 8RP READER INTERFACE MODULE...

Страница 156: ......

Страница 157: ...2F reader data line The LNL 1380 8RP also provides LED status external strike relay control and 12 VDC reader power LNL 1380 8RP Board LNL 1380 8RP Board Callouts Callout Description 1 Status LEDs 2 J...

Страница 158: ...LNL 1380 8RP Reader Interface Module 158 revision 7 5 Reader 8 6 Reader 7 7 Reader 6 8 Reader 5 9 Reader 4 10 Reader 3 11 Reader 2 12 Reader 1 LNL 1380 8RP Board Callouts Callout Description...

Страница 159: ...tches 6 and 7 to the ON position Switch 8 enables encrypted communication All other configuration settings are set in the host software DIP Switch Settings for the LNL 1380 8RP Selection S1 S2 S3 S4 S...

Страница 160: ...F ON OFF OFF ON Address 19 ON ON OFF OFF ON Address 20 OFF OFF ON OFF ON Address 21 ON OFF ON OFF ON Address 22 OFF ON ON OFF ON Address 23 ON ON ON OFF ON Address 24 OFF OFF OFF ON ON Address 25 ON O...

Страница 161: ...two LNL 1380 8RPs additional power must be supplied to the second LNL 1380 8RP from the LNL 3300 M5 Note The 12V output for Reader Port 7 on the second LNL 1380 8RP is not current limited J5 Reader I...

Страница 162: ...c reader cable requirements For more information refer to Specifications on page 169 F 2F and supervised F 2F readers require a shielded 4 conductor cable Clock Data and Wiegand readers require a shie...

Страница 163: ...configurations are downloaded from the host and may be changed Unsupervised Inputs wired to the F 2F Reader For 2 State Supervision wire unsupervised inputs for the door position monitor and REX switc...

Страница 164: ...ntation for the proper connection terminals EOL resistors typically require two 1K ohm resistors Install the EOL resistors as close to the switch as possible within 12 inches 30cm recommended Unsuperv...

Страница 165: ...al TB1 4 or TB3 4 a blocking diode must be added to the circuit This blocking diode should be a Schottky barrier rectifier type 1N5817 or equivalent 20 volt 1 A The external relay s coil current must...

Страница 166: ...protection circuit as close to the load as possible 12 inches 30cm recommended The circuit s effectiveness decreases if it is located further away AC Door Strike Wiring using External Relay AC Door St...

Страница 167: ...Description 1 DC strike 2 To DC power source 3 Fuse 4 External relay 5 TB1 TB2 TB3 or TB4 on LNL 1380 8RP 6 Terminal 1 12 VDC connection for LNL 1380 8RP 7 Terminal 4 Reader LED connection 8 Suppressi...

Страница 168: ...ypted communication Flash cycle of 800 mS ON 200 mS OFF Online encrypted communication 4 flash cycles of 700 mS ON 300 mS OFF Error indication Waiting for firmware to download flash cycle of 100 mS ON...

Страница 169: ...hielded cables 12 VDC 20 AWG 500 ft maximum reader powered by LNL 1320 2RP 18 AWG 3000 ft maximum reader powered locally Notes The above specifications are based on the typical 12 volt reader drawing...

Страница 170: ...LNL 1380 8RP Reader Interface Module 170 revision 7...

Страница 171: ...LNL 8000 MCOM RS 485INTERFACE MODULE...

Страница 172: ......

Страница 173: ...and two wire RS 485 communication A local 12 VDC power supply powers the I O modules in the controller enclosure The LNL 3300 M5 located in the first controller enclosure communicates with the downstr...

Страница 174: ...e that communicates to upstream and downstream controller enclosures TB2 on the LNL 3300 M5 located in the first M5 enclosure is wired to TB2 on the LNL 8000 MCOM in each downstream enclosure This int...

Страница 175: ...the LNL 8000 MCOM as possible 2 Connect the incoming 12 VDC to TB1 3 and ground 12 VDC return to TB1 4 Use at least 18 AWG wire Notes Depending on the system configuration a larger power supply may b...

Страница 176: ...downstream controller enclosures Use conduit when wiring from one enclosure to the next and ensure the conduit is inaccessible With this option the user cannot determine which controller enclosure is...

Страница 177: ...00 bps asynchronous passed through to the back plane Cable Requirements Power 1 twisted pair 18 AWG RS 485 24 AWG 4 000 ft 1 200 m maximum shielded twisted pair 120 ohm impedance Environmental Storage...

Страница 178: ...LNL 8000 MCOM RS 485 Interface Module 178 revision 7...

Страница 179: ...ng external relay 105 128 148 167 internal relay 102 103 125 126 Default login security enhancements 37 Device address setting LNL 1100 20DI 59 LNL 1200 16DO 69 LNL 1200 16DOR 79 LNL 1320 2RP 91 LNL 1...

Страница 180: ...O DIP switches 69 setting the baud rate 69 setting the device address 69 specifications 74 status LEDs 73 84 LNL 1200 16DOR DIP switches 79 relay output wiring 81 setting the baud rate 79 setting the...

Страница 181: ...mper 46 input power 46 power fault input 46 LNL 8000 MCOM communication wiring 174 enclosure tamper wiring 176 input power wiring 175 power fault switch options 21 power fault wiring 176 RS 485 interf...

Страница 182: ...NL 3300 M5 53 LNL 8000 MCOM 177 Status LEDs LNL 1100 20DI 63 LNL 1200 16DO 73 84 LNL 1200 16DOR 84 LNL 1320 2RP 106 LNL 1320 S2RP 129 LNL 1340 M2K 152 LNL 1380 8RP 168 LNL 3300 M5 52 Supervised F 2F r...

Страница 183: ...r strike 100 123 LNL 8000 MCOM 174 outputs relay 81 power LNL 3300 M5 46 power fault LNL 8000 MCOM 176 power fault input LNL 3300 M5 46 reader interface module to reader 162 supervised inputs to F 2F...

Страница 184: ...UTC Fire Security Americas Corporation Inc 1212 Pittsford Victor Road Pittsford New York 14534 USA Tel 866 788 5095 Fax 585 248 9185 www lenel com docfeedback lenel com...

Отзывы: