20
Play Deck Model 5010 • 09-1209
Items needed for this phase:
Hardware needed for this phase:
Phillips Truss Head Bolt * 1/4-20 x 1" * 4 Req
Phillips Barrel Nut * 1/4-20 x 3/4" * 4 Req
Fender Washer * 5/16" x 11/16" * 8 Req
Internal Tooth Lock Washer * 5/16" – 19/32" OD * 4 Req
Step 32
: Measure in about 1" from the E1s and E2s. Mark the ground, and then twist the metal stakes into the
ground. Leave 2" of the metal stake above the ground. Note: You may need to use a long screwdriver
for leverage.
Step 33
: Pre-drill the holes for the stakes with a 5/16" drill bit. Attach the metal stakes to N7 and N1 with 1"
Phillips truss head bolts, lock washers, fender washers, and 3/4" Phillips barrel nuts.
Phase 13: Stake Assembly
Y41 * Metal Stake * 4 Req
N1
N7
E2
E2
E1
E1
Lock Washer
Phillips
Truss
Head
Bolt
Fender
Washer
Phillips
Barrel Nut
Fender
Washer