17
Play Deck Model 5010 • 09-1209
Items needed for this phase:
Hardware needed for this phase:
17
Wood Screw * #14 x1-1/2" Button-Head w/Phillips * 4 Req
Flat Washer * 5/16" SAE – 11/16" OD x 11/32" ID * 4 Req
Internal Tooth Lock Washer * 5/16" – 19/32" OD * 4 Req
Step 27
: Pre-drill the holes for the hand grips with a 1/8" drill bit. The holes should be 56" and 64" from the
ground.
Attach the hand grips to the right E1 and right E2 with 1-1/2" button-head wood screws, lock washers,
and fl at washers.
Phase 10: Hand Grip Assembly
X35-Y * Hand Grip * 2 Req
E2
E1
Front
Right
56"
64"