11
Play Deck Model 5010 • 09-1209
Items needed for this phase:
Hardware needed for this phase:
Lag Screw * 5/16" x 2" * 12 Req
Fender Washer * 5/16" x 11/16" * 12 Req
Internal Tooth Lock Washer * 5/16" – 19/32" OD * 12 Req
P4 * Floor Rail * 1 Req
P10 * Floor Rail * 1 Req
N5 * Base Board * 2 Req
Step 13
:
Attach
P4
and
P10
to the E1s and E2s with 2" lag screws, lock washers, and fender washers.
Step 14
:
Attach the
N5s
fl ush to the bottom of the E1s and E2s with 2" lag screws, lock washers, and fender
washers.
Phase 4: Frame Assembly
P10
P4
N5
N5
• Always drill pilot holes when using
lag screws.
• Tap the head of the lag screw with a
hammer to start the threads into the
wood, and then use a 1/2" socket to
tighten.
Typical Installation - Lag Screw
Fender
Washer
Internal
Tooth Lock
Washer
Lag Screw
Do not over-tighten.
E1
E1
E2
E2