
18
6.2 Operating readiness
Hook up the strain relief of the
power supply cord (1)
into the
spiral holder (25)
and then check the basic
setting of the
welding nozzle (9).
must be able to move freely and must not hinder the user or third parties during work
(trip hazard).
• The extension cables must be authorized for the utilization site (such as, outdoors) and be marked accordingly.
Take the necessary minimum cross-section for extension cables into account as required.
On-site generators for power supply
When using on-site generators as a power supply, please ensure that the on-site generators are grounded and
equipped with residual-current circuit breakers.
For the nominal output of the power plants, the formula “2 x nominal output of the hot-air welder” applies.
Power cord and extension cable
In cases of supply power failure, during work inter-
ruptions or when cooling down, you must swivel the
hot-air blowers (10)
into park position and allow them
to engage there.
Take care to ensure that the
hot-air blower lock (15)
engages.
15
10
1
Содержание UNIROOF 300
Страница 28: ...28 Switching off Target and Actual Value Display see 10 4 Switching on ECO Mode see 10 5...
Страница 29: ...29 Switching off Data Recording see 10 6 Switching on Advanced Mode see 10 7...
Страница 37: ...37 10 7 Advanced mode settings Example Activate WLAN Press 4 times...
Страница 38: ...38 Switch on Info Mode Example Setting the time...
Страница 39: ...39 General information Reset distance counter...