15
iCON grade, System Installation
orange part in figure below. The sensor should be mounted with the
connector facing forwards and the label facing to the left.
4. When the mast is vertical, the mast tilt sensor should be mounted so
that it’s horizontal. Ideally the sensor should be mounted with an
offset of less than 1.5%. The figure below shows the mounting
backed welded in place.
5. Run the cable from the mast tilt sensor to a CAN Junction Box, and
place the CAN Junction Box, somewhere near the rotation sensor.
6. Connect the cable from the cross slope sensor to the CAN Junction
Box, and connect a cable from the CAN Junction Box, to the rotation
sensor.
Sensor mounted on the part that tilts with the blade.
Содержание iCON grade iGG Series
Страница 1: ...Leica iCON grade iGGx Installation Manual Version 2 0 HITCHDOC HE1597_R0 INSTALL MANUAL LEICA iGGx ...
Страница 6: ...Table of Contents iCON grade 6 ...
Страница 10: ...10 iCON grade System Installation Negative battery disconnected ...
Страница 83: ...83 iCON grade How to Upgrade the Firmware ...