![Lehigh E-Flex EFRP-04 Скачать руководство пользователя страница 31](http://html.mh-extra.com/html/lehigh/e-flex-efrp-04/e-flex-efrp-04_installation-and-user-manual_1872265031.webp)
23
E-Flex User Manual, Rev. 1.30
Set Demand Response Fade Time
On a demand response event the EFRP will provide a smooth fade of all zones down to the DR maximum
level. If a zone is at or below its maximum level no fade occurs for that zone.
Press
Enter
at the tcci menu, the
Polarity list control
is displayed.
Press the
Down
button to scroll to the
tcci
demand response menu item.
Press
Enter.
The
tcci
demand response fade time entry control will be
displayed.
Press
Enter.
The current fade time will be displayed.
Use the
Up
and
Down
buttons to set the fade time from 1 to 30 minutes. The
default is 1 minute.
Press
Store
button to record the new setting.
Set Demand Response Load Shed Values
Each zone can be independently set with its own load shed value. This sets the DR maximum level for a
zone as (100% - load shed value).
Press
Enter
at the tcci menu, the
Polarity list control
is displayed.
Press the
Down
button to scroll to the
tcci
demand response menu item.
Press
Enter.
The
tcci
demand response fade time entry control will be
displayed.
Press the
Down
button to scroll to the
tcci
demand response shed value menu
item.
Press
Enter
to display the
zone select
entry control.
Use the
Up
and
Down
buttons to select a zone to set the load shed value.
Press
Enter.
The current load shed value will be displayed.
Use the
Up
and
Down
buttons to set the shed value from 10 to 40%. The
default is 15%.
Press
Store
button to record the new setting.
Содержание E-Flex EFRP-04
Страница 1: ...E Flex Installation and User Manual Rev 1 30 F552 13 November 2017 ...
Страница 2: ......