Archimod®
Oper
ating and main
tenanc
e manual
51
The images of the different main frame pages are given below.
MAIN PAGE
DATA DISPLAYED
1 input – output – battery;
1st line: UPS operating status;
2nd line: Input voltages;
3rd line: Voltage set in output, active power absorbed by the load and
total load applied percentage
4th line: Bar showing residual battery capacity and actual time
of operation in the case of a power failure.
2 input – percentage output - battery;
1st line: UPS operating status;
2nd line: Input voltages;
3rd line: Load percentage on the phases in output;
4th line: Bar showing residual battery capacity and actual time
of operation in the case of a power failure.
3 bypass – output – battery;
1st line: UPS operating status;
2nd line: Bypass voltages;
3rd line: Voltage set in output, active power absorbed by the load
and total load applied percentage
4th line: Bar showing residual battery capacity and actual time
of operation in the case of a power failure.
4 bypass – percentage output – battery;
1st line: UPS operating status;
2nd line: Bypass voltages;
3rd line: Load percentage on the phases in output;
4th line: Bar showing residual battery capacity and actual time
of operation in the case of a power failure.
5 load availability in output;
1st line: UPS operating status;
2nd line: Phase L1: power in kVA or Watt with respect to nominal power
or current with respect to the nominal and relative percentage;
3rd line: Phase L2: power in kVA or Watt with respect to nominal power
or current with respect to the nominal and relative percentage;
4th line: Phase L3: power in kVA or Watt with respect to nominal power
or current with respect to the nominal and relative percentage;
6 measurements on the output;
1st line: UPS operating status;
2nd line: Phase L1 in output: Voltage, current and active power;
3rd line: Phase L2 in output: Voltage, current and active power;
4th line: Phase L3 in output: Voltage, current and active power.
7 Output line voltages;
1st line: UPS operating status;
2nd line: output: line voltage between phases L1 and L2;
3rd line: output: line voltage between phases L2 and L3;
4th line: output: line voltage between phases L3 and L1
ARCHIMOD
BYP
λ
232V/231V/229V
OUT 0%/ 0%/ 0%
Batt. 12h
ARCHIMOD
L1o
0.4/
40kVA 1%
L2o
0.5/
40kVA 1%
L3o
0.5/
40kVA 1%
ARCHIMOD
L1o231V
1.7A 27W
L2o229V
1.6A 31W
L3o231V
1.9A 29W
ARCHIMOD
IN
λ
230V/228V/227V
OUT 0%/ 0%/ 0%
Batt. 12h
ARCHIMOD
BYP
λ
230V/231V/229V
OUT
λ
230V 95W 0%
Batt. 12h
ARCHIMOD
IN
λ
230V/226V/227V
OUT
λ
230V 93W 0%
Batt. 12h
ARCHIMOD
L1o-L2o 400V
L2o-L3o 399V
L3o-L1o 396V
Содержание Archimod
Страница 1: ...Archimod Operating and Maintenance Manual Part LE05755AA 09 12 01 GF ...
Страница 2: ...Archimod 2 EN ENGLISH 3 ...
Страница 13: ...Archimod Operating and maintenance manual 13 3 3 Models UPS Archimod 20 18U UPS Archimod 20 UPS Archimod 40 ...
Страница 14: ...14 3 Technical description UPS Archimod 60 UPS Archimod 80 UPS Archimod 100 ...
Страница 15: ...Archimod Operating and maintenance manual 15 UPS Archimod 120 UPS Archimod Battery ...
Страница 81: ...81 Archimod ...
Страница 82: ...82 ...
Страница 83: ......