background image

[3] 

 

Storage and Unpacking 

Storage: 

The Vending Machine should be stored and 
transported in an upright position. If the Vending 
Machine is tilted beyond 45 degrees of vertical, oil 
may drain from the compressor casing. Should this 
occur, it’s recommended that the Vending Machine 
be returned to a vertical position for at least 1 hour 
before energizing the unit. This will allow oil that 
may have migrated out of the casing an opportunity 
to drain back to the compressor. 

Unpacking: 

Prior to installation, the outer packaging on the 
Vending Machine will need to be removed. The 
majority of the packaging materials can be recycled 
and disposed of in an environmentally friendly 
manner.  The wooden skid is secured to the 
Vending Machine with hex-headed screws and will 
require the use of a 3/8" hex-socket for screw 
removal.  

Vending Machine Pallet Removal: 

 

1.

 

First remove two screws from each side 
perimeter board using a long 3/8” hex-
socket. 

 

 

2.

 

Remove the six Philips screws from the 
front perimeter board and remove board. 

 

 

 

3.

 

Remove two Philips screws from the left or 
right side. This will remove the skid footing 
to aid in use of pallet jack. 

 

 

4.

 

Insert pallet jack from the front side. 
CAUTION: Stay clear of the load cells. 

 

 

5.

 

Use lifting device to lift the unit high 
enough to remove pallet and the orange 
pallet cushions from the back.  

 

 

6.

 

Slide unit off of the pallet jack into position 
on a sturdy level surface. Use stackers 
included if needed.   

              

 

 
  

Содержание VM40

Страница 1: ...er Street P O Box 206 New Lisbon WI 53950 1 800 766 5337 www leerinc com Vending Machine INSTALLATION OPERATION AND SERVICE MANUAL Scan here to be taken to the Leer Support Vending Installation page Form 1070019 01 17 ...

Страница 2: ...nding Machine at Retail Location 6 Door Locks and Sensors 6 Calibrate Scale Before Loading Ice 6 Test Transactions 6 Loading Ice 7 Stocking Instructions 7 Operating Mode Display 7 Possible Displayed Alarm Codes 8 Maintenance 8 General 8 Cleaning Condenser Coils 8 Defrosting 9 Cleaning the Vending Machine 9 Vending Machine Door Maintenance 9 Vending Calibration 9 Replacement Parts 9 Part Returns 9 ...

Страница 3: ...recycled and disposed of in an environmentally friendly manner The wooden skid is secured to the Vending Machine with hex headed screws and will require the use of a 3 8 hex socket for screw removal Vending Machine Pallet Removal 1 First remove two screws from each side perimeter board using a long 3 8 hex socket 2 Remove the six Philips screws from the front perimeter board and remove board 3 Rem...

Страница 4: ...the factory pre set cut out temperature of 16 degrees F Reporting Provision Code 3 At start up watch for and record the provision code to be displayed on the card reader Report the provision code to Vendnovation by calling 425 637 2344 Vendnovation will provision the Vending Machine and update firmware if needed Vendnovation will assign product and link to test credit card system Door Locks and Se...

Страница 5: ...ding Machine will also help ensure that the evaporator drain tube which exits the back wall is not being restricted or blocked during the defrost cycle Locate the Vending Machine so that the main power cord is within reach of an electrical outlet WARNING DO NOT use extension cords as they decrease the voltage to the unit and ultimately cause compressor failure Outdoor Vending locations shaded from...

Страница 6: ...unit does not start within a few seconds check the on off switch located next to the electronic control display The Vending Machine will continue to run until cut out temperature of 16 degrees F Door Locks and Sensors After the unit has been running for 30 minutes the doors can now be tested 3 Check the doors they should be locked 4 Turn the MODE key to the SET UP position Synchronize Inventory wi...

Страница 7: ... Set Key To initiate a manual defrost cycle press and hold the Manual Defrost Key for more than 2 seconds Note Manual defrost will not initiate if the cabinet temperature is above 40 degrees F The electronic control combines the functions of both a mechanical thermostat and a defrost timer into a single control The control also offers the consumer the capability of monitoring the operational statu...

Страница 8: ...ontact information is available on our web site at http www leerinc com ice merchandisers merchandiser sales distributors The defrost circuit is equipped with a defrost termination switch This switch is attached to one of the evaporator coil tubes located inside the unit cooler assembly This switch senses temperature and will cycle power off to the defrost heat element should the temperature at th...

Страница 9: ...s based cleaners abrasive cleaners containing chlorine bleach and any form of solvent based cleaners are not reccommended They may leave objectionable odors inside the cabinet which may be absorbed by the ice being stored in the Vending Machine Vending Machine Door Maintenance Routine inspection of the door gasket seal and the action of the door s hinges are recommended Door gaskets may mildew and...

Страница 10: ... 10 Wiring Diagram ...

Страница 11: ...pressor coil Yes Evaporator hose obstructed or kinked Defective wiring in defrost circuit Possible defective defrost heat circuit or controller Compressor functioning no ice build up on compressor coil Yes Incorrect refrigerant Wrong or low voltage Impurities in refrigerant charge Interior light functioning Yes No Defrost icon left hand of control display No Defective controller wiring Defective e...

Страница 12: ... A higher Tare weight equals less bags and a lower Tare weight equals more bags Missed sales Door sensor magnets Check door sensor magnets In set up mode hit cancel to the Hardware icon press enter press cancel repeatedly until Test Door is displayed press enter With doors closed the display should say closed Then open each door to check sensor operation Press cancel when finished to lock doors Re...

Страница 13: ...epair or replacement of any defective part s or assembly only for defects reported to Seller within ninety 90 days after the date of installation ALL LABOR CHARGES SHALL BE AUTHORIZED OR APPROVED BY SELLER PRIOR TO THE REPAIR OR REPLACEMENT OF PART S In all other events Seller shall not be responsible for any labor charges Labor charges shall only include standard straight time labor hours at the ...

Страница 14: ...Packaging of the manual before uncrating the Vending Machine Use caution when moving your Vending Machine Weight sensors are located under the Vending Machine Only use pallet jack or fork truck with care away from weight sensors ...

Отзывы: