LAUNCH
TLT830WA Product Manual
10
z
Requirements for the lifting machine control box installed near the power control switch, for maintenance
and emergency cut off power supply circuit. Electrical components damage due to error wire connection is
not covered by warranty.
z
Oil Injection capacity as required. Do not start the motor without oil
z
Fill hydraulic oil N32 or N46 (approximate 20L) into the oil tank (using oil gauge to check the level). Pay
special attention to avoid dust and contaminants into the oil.
z
After hoses are assembled, press up button to check power system. If motor does not run, or gets
abnormal noise, or motor runs but lift does not go up or motor heats up. The power must be cut off and
check the wiring connection.
lowering
valve
II
380
~
~
~
PE
VD
27
T
H
6
0
7
8
11
13
14
19
21
22
23
0
electric
relay
Bi -
directional
valve I
Bi -
directional
valve
II
smaller
cylinder
valve
II
lowering
valve
II
buzzer lowering
valve I
small
air
cylinder
valve I
electric
relay
time
relay
Bi -
directional
valve I
Bi -
directional
valve II
small
air
cylinder
valve
I
lowering
valve
I
limit
switch
I
limit
switch
II
Optical
switch
small
air
cylinder
valve
II
Fig 8
Notice
:
High Voltage inside the control desk! Wiring should be performed carefully
5.2.4 Hydraulic Hose Connection
z
TLT835WA Hydraulic pipeline as shown in figure 9
。
To inject hydraulic oil into the tank in accordance with
the requirements and capacities
,
then connect the hydraulic hose Z1 to hydraulic pipe fitting Z1 inside
the control box and tighten the fitting, Check the status of the combined valve. (Main cycle is opened and
the subsidiary is closed.)
z
Press UP button
,
Test power supply unit
:
If the motor does not run, abnormal noise, the motor is running
but the table does not raise abnormal motor heat. At this point should be immediately shut down and
check the electrical connections are correct
z
Press UP button, raise the host platform to 1.5 m (59') high, press the safety lock button, makes
machinery insurance work