8
component in the tunnel. Location of tunnel floor dimensions refer to figure 7
Warnings
:
♦
The depth of the pits should over 200mm
,
The strength of the concrete ground should
be great than 3000PSI
(
2.1kg/mm2
)
,
and the tolerance of the concrete floor levelness
should not exceed 5mm
(
0.2
″)
。
♦
Use the lifting equipment to put the host and vice machine into the pit
7 8 0
6 7 0
6 7 0
20
00
Mi
n
8 0 0 M i n
46
00
4 0 0 M i n
18
00
Ma
x
900
4 5 °
φ 1 0 0
20
33
0
48
0
w a l l
Fig 6
5.2.2 Above floor installation
♦
Equipment installation shown in figure 7
,
total width with 2530 mm ( 99.6 '' ), draw two
parallel lines on top of the concrete slab ( 1# and 2# ), error in 3mm ( 0.1 in ).
♦
And then draw the four parallel lines ( A, B, C, D ), and 1# and 2# perpendicular to the
line
♦