background image

LaserBit Giga Series 4.3                                          page     

44 

10.4.3 

Alignment of the heads 

 

 

• 

Target Side B with the crosshair built in to the 
head on Side A 

• 

Repeat the first step with Side B! 

• 

Power up the heads! 

• 

Screw the three nuts up tight on both heads, 
which are used for the horizontal fixation, but be 
careful that the heads do not move out from its 
position! 

• 

Screw the two nuts up tight on both heads, which are used for the fixing the 
vertical direction, but be careful that the heads do not move out from its 
position! 

Meanings of the LEDs 

 

Power: 

The head is powered up.   

RX OK: 

There is enough light to start 
communicate through the link. 

Level LEDs: 

The function of these10 
green LEDs is to give visual 
information about the incoming 
light efficiency 

Installation LED: 

It signs you have the biggest 
amount of incoming light 
efficiency which is still not 
overloads the receiver 

Saturation: 

Overload (Overloading can cause stop in the communication, and permanently it can 
damage the receiver) 
After 15mW (or higher) incoming light efficiency 
 

 

Содержание GigaPICO

Страница 1: ...GigaPICO GigaPINTO GigaPRONTO Users Manual 4 3...

Страница 2: ...way that nobody can access the optical window or can get in the way of the laser beam accidentally For detailed instructions please read chapter 5 3 5 Eye Safety on page 20 The Laserbit product provi...

Страница 3: ...des Handbuchs enth lt ausf hrliche Anweisungen zum Schutz der Augen Das Laserbit Produkt ist mit allen notwendigen Warnhinweisen versehen die durch die Standards vorgebenen werden Weitergehende Hinwei...

Страница 4: ...ue personne ne puisse acc der la fen tre optique ou traverser le rayon laser par accident Pour instructions d taill es lire la partie S curit de l il dans le chapitre 5 3 5 du manuel la page 20 Le pro...

Страница 5: ...ssuno possa accedere la finestra ottica o esporsi al raggio di lazer per caso Per informazioni piu detagliati vedi la parte Sicurezza Ochhi del capitolo 5 3 5 nel manuale sulla pagina 20 I prodotti La...

Страница 6: ..._____________ 17 6 1 Contents of a Laserbit GigaPICO link _______________________________ 17 6 2 Contents of a Laserbit GigaPINTO link package ______________________ 18 6 3 Contents of a Laserbit Giga...

Страница 7: ...__________________________________ 41 10 4 2 Fixing the heads ______________________________________________ 43 10 4 3 Alignment of the heads_________________________________________ 44 10 4 4 Connect...

Страница 8: ...SO systems use a laser diode as a light source and a receptor diode photo diode to receive the signals coming from the laser diode from the transmitter side But the basic elements are still the same l...

Страница 9: ...ion across rivers and other natural or artificial obstacles where cable is not available The transmission technique used in the Laserbit FSO devices provides transparent and wire speed data transfer w...

Страница 10: ...is amplified encoded and then drives the laser diode The transmitter optics assures the proper beam shape and controls the beam divergence The receive optics perceives and directs the transmitter sign...

Страница 11: ...e Areas with natural or artificial obstacles Where cable is actually not an alternative like across rivers or railways or in rugged terrain Urban areas Where only leased lines are available with limit...

Страница 12: ...kets and partners in the Laserbit is keep going today which are helped with trainings meetings and other programs and a fine support community The purpose is to manufacture cost effective and best qua...

Страница 13: ...n The system contains built in signal monitoring unit which features a visual signal strength indicator and LINK status information accessible on the rear of the head assembly The optional IP Based Ma...

Страница 14: ...ength indicator and LINK status information accessible on the rear of the head assembly The optional Indoor Interconnection Unit contains the IP Based Management Hardware LB MGM The bar graph of the L...

Страница 15: ...and the network interface The PSU provides the low voltage power required to operate the laser head while the data port offers direct connectivity for standard network equipments The system contains...

Страница 16: ...d cost effective solution for high speed wireless connections featuring lightweight compact mechanical design Giga systems provide Gigabit Ethernet wire speed full duplex data transfer require no adju...

Страница 17: ...Contents of a Laserbit GigaPICO link For the GigaPICO systems Laserbit provides all the necessary accessories to fix the head to the bracket fix the Power supply unit and the bracket to the wall below...

Страница 18: ...and the bracket to the wall below you can see what is provided in the GigaPinto package 2ps of LB ODIUs Outdoor Inter Unit the two grey plastic boxes ODIU accessories o 2ps of 276x11 o 2x4ps of 6x40 s...

Страница 19: ...m spring washers o 2x4ps of 8mm washers accessories for the head fixing on the legs of the heads o 2x4ps of M8 nuts o 2x4ps of 8mm spring washers o 2x4ps of 8mm washers 7 Sites of installation 7 1 Key...

Страница 20: ...the other hand high structures like towers skyscrapers or poles are always subject to movement Mount the support frame to walls of the building or near corners as they are the most stable spots Use a...

Страница 21: ...is possible Examine both sides of the link at sunset and sunrise and find a position where the sun cannot get behind any of the heads Be aware that the path of the sun is changing throughout the year...

Страница 22: ...apest Kunigunda u 45 HUNGARY Tel 36 1 453 7440 Fax 36 1 240 3570 www laserbit net NAME Outdoor Interconnection Unit Type LB ODU 230 PINTO S N LBP 6300984 Primary side 230VAC 50Hz 0 2A Secondary side 8...

Страница 23: ...all drill to drill all of the holes into the wall Clean the holes Place the wall plugs into the holes please note that some times you need to use hammer to put the wall plugs into the hole if you have...

Страница 24: ...n mounting Installation steps Place the bracket on the wall Mark the wall with a permanent marker Use your 12mm wall drill to drill all of the holes into the wall Clean the holes Place the wall plugs...

Страница 25: ...serbit There are no two installation sites from the same kind Sometimes individual design is required Laserbit provides wide range of Brackets can be found on this CD feel free to modify or manufactur...

Страница 26: ...ill drive the screw into the hole through the plastic bag Refer to the packaging about the timing while the glue sets solid enough to enable you to strain the screw After it sets dry place the mountin...

Страница 27: ...strength LED s Make sure that the Saturation indicator is OFF Adjust your attenuators if necessary to avoid saturation of the receivers Please note that at this short distance specially the longer di...

Страница 28: ...t IP65 for the electrical devices The transformer is a not switch able transformer so the main voltage must match to the one marked on the front cover If the main power is different then this can dama...

Страница 29: ...ll on the metal plate to the legs of the screws Fix the metal plate with four M5 nuts using the four washers and four spring washers like in the figure Then you can fix the whole construction to a wal...

Страница 30: ...CO head can be fixed to its stand with the three M6x25 bolts On the figure you can see a plinth of a GigaPICO unit a head of a GigaPICO mounting bracket and the necessary fixing parts The steps of the...

Страница 31: ...the vertical direction but be careful that the heads do not move out from its position Meanings of the LEDs Power The head is powered up RX OK There is enough light to start communicate through the l...

Страница 32: ...lts make the two bolts hand tight 2 Tight the left bolt with a 10mm spanner and look at the readings on the receiver if the receiving level start decreasing again start using the bolt on the right han...

Страница 33: ...0 2 4 Connecting to your Network You have a TC head You can find a two sided fibre connector in your ODIU You have to connect the fibre cable of your head into the one side of the connector and into t...

Страница 34: ...head power cable You have to connect these two wires into two pins of the four of the two green connectors These pins are connected to the pins of the RJ11 Service Connector The order of connections...

Страница 35: ...P65 for the electrical devices The transformer is a not switch able transformer so the main voltage must match to the one marked on the front cover If the main power is different then this can damage...

Страница 36: ...ll on the metal plate to the legs of the screws Fix the metal plate with four M5 nuts using the four washers and four spring washers like in the figure Then you can fix the whole construction to a wal...

Страница 37: ...ted pair wired cable Red 12V Black 12V Twisted green yellow GND 10 3 2 Fixing the heads Your GigaPINTO head can be fixed to its stand with an alignment base unit ABU The ABU and its fixation to the st...

Страница 38: ...ing the vertical direction but be careful that the heads do not move out from its position Meaningsofthe LEDs Power The head is powered up RX OK There is enough light to start communicate through the...

Страница 39: ...late the vertical state of the head and necessary the beam too For the fine adjustment you need two wrenches With one of them you have to hold the head of the bolt and with the other you can turn the...

Страница 40: ...to be on the other and if you plug in the transmitter side of the head into a connector then the transmitter side of the network have to be in the opposite connector of the previous and do the same w...

Страница 41: ...P65 for the electrical devices The transformer is a not switch able transformer so the main voltage must match to the one marked on the front cover If the main power is different then this can damage...

Страница 42: ...ll on the metal plate to the legs of the screws Fix the metal plate with four M5 nuts using the four washers and four spring washers like in the figure Then you can fix the whole construction to a wal...

Страница 43: ...figure next to this text Order of the cables from the head the four twisted pair wired cable Red 12V Black 12V Twisted green yellow GND 10 4 2 Fixing the heads Your GigaPRONTO head can be fixed to its...

Страница 44: ...ng the vertical direction but be careful that the heads do not move out from its position Meanings of the LEDs Power The head is powered up RX OK There is enough light to start communicate through the...

Страница 45: ...late the vertical state of the head and necessary the beam too For the fine adjustment you need two wrenches With one of them you have to hold the head of the bolt and with the other you can turn the...

Страница 46: ...to be on the other and if you plug in the transmitter side of the head into a connector then the transmitter side of the network have to be in the opposite connector of the previous and do the same w...

Страница 47: ...eater panel This can be depending on the version 12VAC 12VDC or 8 5VDC This panel senses the temperature based on the sensor glued to the front window and turns on the glass heater or turns it off The...

Страница 48: ...ly 0 48VDC In this type of ODIU you can find fuses only on the primarily side of the transformer Type GigaPICO GigaPINTO GigaPRONTO fuse T6 3A 250V T6 3A 250V T6 3A 250V In this case you have the 3 po...

Страница 49: ...ng loss of data lost profits lost savings lost business or other incidental or consequential or indirect damages arising out of the installation use maintenance performance failure or interruption of...

Страница 50: ...The foregoing warranties and remedies are exclusive and are in lieu of all other warranties expressed or implied either in fact or by operation of law statutory or otherwise including warranties of me...

Страница 51: ...1 Appendix A a Product registration form Please take your time to fill out Laserbit product registration form to ensure your warranty period begins otherwise Laserbit consider warranty beginning from...

Страница 52: ...LaserBit Giga Series 4 3 page 52 b Failure report form In case of failures please report it to us and fill out the failure report form forward to your distributor...

Страница 53: ...max 110 VAC and 48VAC optional Power to head 2 x 8 VDC 30 VDC 2 x 1 A max Power consumption 28 VA O Op pt ti ic ca al l C Ch ha ar ra ac ct te er ri is st ti ic cs s Wavelength 785 nm Beam divergence...

Страница 54: ...VAC and 48 VDC optional Power to head 2 x 8 VDC 30 VDC 2x1 A max Power consumption 70 VA O Op pt ti ic ca al l C Ch ha ar ra ac ct te er ri is st ti ic cs s Wavelength 785 nm Beam divergence 0 5 15 m...

Страница 55: ...optional Power to head 2x12 VDC 2x1 A max Power consumption 85 VA O Op pt ti ic ca al l C Ch ha ar ra ac ct te er ri is st ti ic cs s Wavelength 785 nm Beam divergence 0 5 15 mrad Receiver acceptance...

Отзывы: