Section 5: Maintenance & Lubrication
RC3615 and RCM3615 Series 2 S/N Rotary Cutters 330-502M
12/12/18
52
Figure 5-14
8-10 pumps
Zerk Located through slot in tube
CV Driveline without overrunning clutch
23556
8-10 pumps
CV Driveline with overrunning clutch
39280
4-5 pumps
2-3 pumps
2-3 pumps
4-6 pumps
CV Driveline without overrunning clutch
23556
CV Driveline with overrunning clutch
IMPORTANT:
Attach safety chain (#1) to tractor frame.
Attach safety chain (#2) to cutter frame.
39280
4-5 pumps
2-3 pumps
4-6 pumps
2-3 pumps
2
1
CV Main Driveline Profile Tubes
With External Grease Point
CV = Constant Velocity
Type of Lubrication: Multi-purpose Grease
Quantity = 8-10 pumps
IMPORTANT:
To extend the life of the constant
velocity joint, extensive lubrication must be
performed every 8 hours of operation.
CV Main Driveline Joints
CV = Constant Velocity
Type of Lubrication: Multi-purpose Grease
For instructions on how to access grease zerks shown
in Figure 5-14: See
“Accessing CV Driveline Joints”
•
The constant velocity joint should be greased in a
straight position forcing grease through the passages
and into the cavity. After lubrication, grease should
be visible around the ball joints.
•
Grease fittings located on the u-joints and driveline
shields should be lubricated every 8 Hrs of operation.
IMPORTANT:
To extend the life of the constant
velocity joint, extensive lubrication must be
performed every 8 hours of operation.
8
Hours
8
Hours