1
1.
INSTALLATION
1.1
RECEIVING
Each shipment is completely tested under operating conditions and thoroughly inspected before
shipment. At time of shipment, the carrier accepts the Unit and any claim for damage must be made
with the carrier. Upon receiving Unit from the delivering carrier, carefully inspect carton for visible
indication(s) of damage. If damage exists, have carrier note same on bill of lading and file a claim
with the carrier.
1.2
UNPACKING
A. Cut packing band and remove.
B. Lift and remove top portion of carton.
C. Remove inner packing.
D. Remove package containing installation kit.
E. Lift plywood shipping base, and remove lower portion of carton.
F.
Slide a corner of unit (on plywood shipping base) over the edge of counter and remove the
shipping screw and washer from unit.
G. Replace shipping screw and washer with a 3/8” x 16 stainless Phillips truss head from
installation kit.
H. Repeat procedure for remaining corners.
I.
Slide unit off of plywood shipping base.
NOTE
Save the original carton, inner packing material, and plywood shipping base for future use in the
event unit is to be returned or transported.
J.
Inspect Unit for concealed damage and if evident notify delivering carrier and file a claim against
same.
NOTE
If unit is to be transported to a different location for installation, it could be transported easier if
the unit is left firmly mounted to the shipping base.
1.3
SELECTING COUNTER LOCATION
A. Select a location close to a properly grounded electrical outlet and water supply that meets the
requirements listed on the Specification Page.
CAUTION
WITHOUT PROPER VENTILATION, THE UNIT’S COMPRESSOR WILL OVERHEAT, POSSIBLY
TRIP THE OVERLOAD PROTECTOR, AND HAVE SIGNIFICANTLY SHORTER LIFE.
B. Condenser air is drawn in the back of the Unit and exhausted out the top. The Unit requires a
minimum of four (4) inches between the wall, ceiling, and the back of the wrapper for proper
ventilation.
C. Seal unit to countertop by applying a small bead of clear silicone R.T.V. sealant around the
perimeter of the base platform. Use a sealant that is designated for countertop application.
1.4
FILLING THE UNIT WITH WATER
The water bath overflow is located in the back center of the product compartment, behind the pump
platform sheet metal plate.
A. Remove the top cover.
B. Remove the yellow cap.
C. Insert water hose into exposed hole.
D. Open front door.
E. Use a flashlight to see the overflow hole through the two upper rectangular slots in the pump
platform sheet metal plate.
F.
Stop the water flow when water drips out from the overflow hole.
G. Shut the front door, and remove water hose.
H. Replace the yellow cap and replace the top cover.