
9.3 Handling
The initial launching and the first tests of the different equipments
shall be carried out by your dealer so you can expect to enjoy the
warranty in case of some equipment failure.
All further handling shall be carried out with the highest care by
professionals.
If the Lagoon boatyard is not involved in handling operations, they
cannot cover under garantee any possible accidents linked to
handling.
If later you have to launch your boat yourself, you should take the
following precautions :
- Retract the sensors under the hull into their housings (they may be
damaged by the handling straps).
- Check the water intake strainboxes for cleanliness.
- Turn off all the water inlet and drain valves (sink, washbasin, heads,
engine).
- Check the anodes are in good condition and properly installed. An
anode shall never be painted.
- Install a fore mooring rope, a rear mooring rope and fenders.
When lifting with the crane, check that the straps are not over any
device (sounder, speedometer, etc.) or over the propeller.
The crane hook will be fitted with a gantry or a spreader system with
two straps.
The straps shall not be connected directly onto the hook, as it would
result in unusual compressive stresses on the hull.
- Crane lifting should be carried out slowly.
- Control the movement of the boat using mooring ropes.
9.4 Mast stepping, mast unstepping
Mast stepping and mast unstepping shall be carried out by a
specialist.
WINTER STORAGE / HANDLING
WINTER STORAGE
HANDLING
9
LAGOON 62O
109
DANGER
Do not stay on board or under the boat during
craning.
Содержание 620
Страница 1: ......
Страница 2: ......
Страница 6: ......
Страница 8: ......
Страница 20: ......
Страница 32: ......
Страница 48: ......
Страница 58: ...24 V SYSTEM LAGOON 62O 56 ELECTRICITY...
Страница 60: ...58 ELECTRICITY LAGOON 62O 12 V SYSTEM...
Страница 66: ...64 ELECTRICITY LAGOON 62O 220 VOLT 50HZ ELECTRICAL SYSTEM STANDARD EQUIPMENT...
Страница 70: ...220 V SYSTEM LAGOON 62O 68 ELECTRICITY...
Страница 71: ...110 V SYSTEM ELECTRICITY 4 LAGOON 62O 69...
Страница 72: ......
Страница 82: ......
Страница 86: ......
Страница 94: ...GRILL ON BOARD UTILITY LAGOON 62O 92...
Страница 96: ......
Страница 102: ...FUEL TRANSFER PUMP PROPULSION LAGOON 62O 100 FUEL TRANSFER PUMP...
Страница 106: ......
Страница 112: ......
Страница 113: ...10 1 MAINTENANCE SCHEDULE S SE EC CT TIIO ON N 1 10 0 U UP PK KE EE EP P M MA AIIN NT TE EN NA AN NC CE E 111...
Страница 118: ......
Страница 119: ......
Страница 120: ......