![Lagoon 52 F Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/lagoon/52-f/52-f_user-manual_3306791023.webp)
MULTIFUNCTION TOUCH SCREEN
21
1
SPECIFICATIONS
LAGOON 52 F
HIGH LOAD AND COMFORT
MANUAL SUPPLY SELECTOR
SWITCHES
WARNING
In case of malfunctioning of the multifunction touch screen, use the
manual supply selector switches located in the technical room of the
forward swim deck to supply the boat with 220 V (High Load and Comfort)
or in the port engine room for air conditioning.
AIR CONDITIONING MANUAL
SUPPLY SELECTOR SWITCH
WARNING
In case of malfunctioning of the multifunction touch screen, use the
override switches to switch on the 12 V appliances.
See pages 100 and 101 of the ELECTRICITY chapter for more details.
FORWARD SERVICE ROOM
SIDE ENGINE HOLD
Содержание 52 F
Страница 1: ...User s guide...
Страница 2: ......
Страница 6: ......
Страница 8: ......
Страница 10: ......
Страница 26: ......
Страница 28: ...DECK EQUIPMENT 26 HULL DECK LAGOON 52 F HULL PROTECTIONS...
Страница 40: ......
Страница 41: ...RIGGING SAILS 3 1 Sailing 3 2 Standing rigging 3 3 Running rigging 3 4 Sails 39 3...
Страница 56: ......
Страница 57: ...ACCOMMODATIONS 4 1 Saloon Galley 4 2 Lighting 4 3 Portholes Deck hatches 4 4 Window blinds 55 4...
Страница 62: ......
Страница 72: ......
Страница 82: ......
Страница 83: ...ELECTRICITY 7 1 12 V circuit 7 2 Inverters 7 3 110 V 220 V circuit 7 4 Electronics 81 7...
Страница 92: ...GENERAL BLOCK DIAGRAM 12 V 90 ELECTRICITY LAGOON 52 F...
Страница 96: ...STANDARD CIRCUIT EQUIPMENT 94 ELECTRICITY LAGOON 52 F INVERTER...
Страница 97: ...CHARGING CIRCUIT 220 V 12 V 95 7 ELECTRICITY LAGOON 52 F...
Страница 106: ......
Страница 107: ...MOTORIZATION 8 1 Engines 8 2 Fuel 8 3 Propellers Anodes 8 4 Optional controls 8 5 Bow thruster 105 8...
Страница 116: ......
Страница 117: ...WINTER STORAGE 9 1 Laying up 9 2 Protection 115 9...
Страница 118: ...PACKING 116 WINTER STORAGE LAGOON 52 F 6000 mm 8744 mm 15839 mm 6809 mm 4227 mm 1505 mm 2768 mm...
Страница 120: ......
Страница 121: ...HANDLING 10 1 Preparation 10 2 Crane lifting 10 3 Mast stepping Mast unstepping 119 10...
Страница 122: ...DIMENSIONS FOR CRADLE POSITIONING 120 HANDLING LAGOON 52 F 2612 5 mm 9312 5 mm...
Страница 124: ......
Страница 126: ...124 SAFETY LAGOON 52 F...
Страница 136: ......
Страница 137: ...MAINTENANCE 135 12...
Страница 140: ......
Страница 142: ......
Страница 143: ......
Страница 144: ...UPDATED 01 2016...