![Lagoon 52 F Скачать руководство пользователя страница 123](http://html1.mh-extra.com/html/lagoon/52-f/52-f_user-manual_3306791123.webp)
HANDLING
121
10
HANDLING
Loosen the guard lines and pass the straps to the outside of them.
The crane hook will be fitted with a gantry or a spreader system with
two slings.
The slings shall not be connected directly onto the hook, as it would
result in unusual compressive stresses on the hull.
- Crane lifting should be carried out slowly.
- Control the movement of the boat using mooring ropes.
10.3 Mast stepping - Mast unstepping
Mast stepping and mast unstepping shall be carried out by a specia-
list.
10.1 Preparation
The initial launching and the first tests of the different equipments
shall be carried out by your dealer so that you can expect to enjoy the
warranty in case of some equipment failure.
All further handling shall be carried out with the highest care by
professionals.
If the LAGOON boatyard are not involved in your handling operations,
they cannot cover under guarantee any possible accidents linked to
handling.
If later you have to launch your boat yourself, you should take the
following precautions:
- Retract the sensors under the hull into their housings (they may be
damaged by the handling slings).
- Check the water suction boxes for cleanliness.
- Turn off all the water inlet and drain valves (grey waters, black
waters, engines).
- Check the anodes are in good condition and properly installed. An
anode shall never be painted.
10.2 Crane lifting
- Install a bow mooring rope, a stern mooring rope and fenders.
When using a crane to move the boat, check that slings cannot touch
any device (depth finder, speedometer, etc.) nor the propellers.
LAGOON 52 F
DANGER
Do not stay on board or under the boat during
craning.
Содержание 52 F
Страница 1: ...User s guide...
Страница 2: ......
Страница 6: ......
Страница 8: ......
Страница 10: ......
Страница 26: ......
Страница 28: ...DECK EQUIPMENT 26 HULL DECK LAGOON 52 F HULL PROTECTIONS...
Страница 40: ......
Страница 41: ...RIGGING SAILS 3 1 Sailing 3 2 Standing rigging 3 3 Running rigging 3 4 Sails 39 3...
Страница 56: ......
Страница 57: ...ACCOMMODATIONS 4 1 Saloon Galley 4 2 Lighting 4 3 Portholes Deck hatches 4 4 Window blinds 55 4...
Страница 62: ......
Страница 72: ......
Страница 82: ......
Страница 83: ...ELECTRICITY 7 1 12 V circuit 7 2 Inverters 7 3 110 V 220 V circuit 7 4 Electronics 81 7...
Страница 92: ...GENERAL BLOCK DIAGRAM 12 V 90 ELECTRICITY LAGOON 52 F...
Страница 96: ...STANDARD CIRCUIT EQUIPMENT 94 ELECTRICITY LAGOON 52 F INVERTER...
Страница 97: ...CHARGING CIRCUIT 220 V 12 V 95 7 ELECTRICITY LAGOON 52 F...
Страница 106: ......
Страница 107: ...MOTORIZATION 8 1 Engines 8 2 Fuel 8 3 Propellers Anodes 8 4 Optional controls 8 5 Bow thruster 105 8...
Страница 116: ......
Страница 117: ...WINTER STORAGE 9 1 Laying up 9 2 Protection 115 9...
Страница 118: ...PACKING 116 WINTER STORAGE LAGOON 52 F 6000 mm 8744 mm 15839 mm 6809 mm 4227 mm 1505 mm 2768 mm...
Страница 120: ......
Страница 121: ...HANDLING 10 1 Preparation 10 2 Crane lifting 10 3 Mast stepping Mast unstepping 119 10...
Страница 122: ...DIMENSIONS FOR CRADLE POSITIONING 120 HANDLING LAGOON 52 F 2612 5 mm 9312 5 mm...
Страница 124: ......
Страница 126: ...124 SAFETY LAGOON 52 F...
Страница 136: ......
Страница 137: ...MAINTENANCE 135 12...
Страница 140: ......
Страница 142: ......
Страница 143: ......
Страница 144: ...UPDATED 01 2016...